My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/23/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
04/23/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2014 2:43:20 PM
Creation date
3/11/2014 10:04:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/23/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEH CHANGE ORDER <br />City of Lino Lakes, Minnesota <br />OWNER <br />OWNERS PROJECT NO. <br />Legacy at Woods Edge - Phase 1 <br />PROJECT DESCRIPTION <br />March 19, 2007 <br />DATE <br />4 <br />CHANGE ORDER NO. <br />A- LINOL0305.03 <br />SEH FILE NO. <br />The following changes shall be made to the contract documents: <br />Description: <br />1. Contractor shall install lift station control panel by SyCom, pumps, piping, and fittings at a cost of <br />$68,877.00 <br />2. Deduct 0.68 LF Extra Depth Sanitary Manhole, 20 LF 6" Forcemain, 35 LF 6" DIP Water Main Class <br />52, 62 LF 8" DIP Water Main, Class 52, 1 Each 10 "x6" Wet Tap, 2 Each 8" Gate Valve & Box, 893 LF 1" <br />Type "K" Copper Tubing, 27 LF Support Existing Storm Sewer Pipe 18 ", 50 LF Support Existing Storm <br />Sewer Pipe 24 ", 247 SF Colored Concrete and add 63.71,1ZP Bituminous Non -Wear Type LV NW 35030C <br />Mixture (Roadway). (- $58,276.02). , <br />Purpose of Change Order. <br />1. Amend scope of contract to include installation of lift station control panel, pumps and all associated <br />piping. Lift station is to serve proposed townhouses on Woods Edge Boulevard. <br />2. Reduction in Sanitary Sewer, Water Main, Storm Sewer, and Street Improvement quantities to reflect <br />actual constructed quantities. <br />Basis of Cost: ® Actual <br />Attachments (list supporting documents) <br />Letter from Glenn Rehbein Companies dated July 17, 2006. <br />❑ Estimated <br />Contract Status <br />Original Contract <br />Net Change Prior C.D.'s 1 to 3 <br />Change this C.D. <br />Revised Contract ` <br />Recommended for Approval: Short Elliott Hendrickson Inc. by <br />BY <br />to by ontrac� <br />Glenn Rehbein Companies <br />w4G� <br />TITLE <br />Distribution Contractor 2 Owner 1 <br />s:1ko\ \ iinn1\ 03Q5Q3\cnnstrnctionphllco#4.doc <br />Time <br />N/A <br />App <br />Cost <br />$2,231,503.85 <br />$400,180.00 <br />$10,600.98 <br />$2,642,284.83 <br />Mas• /Pro =ct Manager <br />d for Owner. <br />BY <br />City of Lino Lakes, Minnesota <br />TITLE <br />Project Representative 1 <br />SEH Office 1 <br />Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 <br />SEH is an equal opportunity employer 1 www.si _ 6 8 -n 1 651.490.2000 1 800.325.2055 1 651.490.2150 tax <br />1/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.