My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-10-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
03-10-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2014 10:17:04 AM
Creation date
3/11/2014 10:10:36 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/10/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metro Transit Site Performance Agreement 021914 .doc page 2 of 9 <br />I. DESIGNATION OF IMPROVEMENTS. <br /> <br />A. Improvements on the project site to be installed at the Developer’s <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as “On-site Work”. <br /> <br />B. Improvements off the project site to be installed at the Developer’s <br />expense, if any, by the Developer as hereinafter provided are hereinafter <br />referred to as “Off-Site Work”. At the date of full execution of this <br />agreement, Developer does not intend on any Off-site Work. <br /> <br />C. Intentionally Deleted. <br /> <br /> <br />II. ON-SITE WORK. <br /> <br />A. On-Site Work. The On-site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on-site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, storm drainage systems, water mains, sanitary sewers, <br />hydrants, curbing, lighting, fencing, fire lanes, sidewalks, trails, outside <br />trash disposal enclosures, exterior building architectural design and <br />building elements, site grading and erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-site <br />Work are as follows: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.