My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/04/2007 Council Packet (2)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
06/04/2007 Council Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2014 1:28:45 PM
Creation date
3/11/2014 1:03:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/04/2007
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In September, 2006, the city requested and received a proposal from Springsted, Inc. to <br />conduct a comprehensive utility rate study. The proposal has recently been refreshed. <br />The study would include reviewing current and background utility data, including <br />historical financial information, volumes, capital improvements, debt service <br />requirements, policies and practices, growth trends and reviewing engineering studies, <br />including the recent conservation plan and water treatment feasibility study. Springsted <br />then would evaluate the current data and consider future needs in developing a <br />comprehensive report which would recommend and justify any future rate adjustments. <br />It is necessary to undertake the study at this time to complement the conservation plan <br />and to implement rate structure recommendations and any rate adjustments in 2008. <br />Springsted would need 12 to 16 weeks to complete the study, and would then present <br />their formal report to the City Council. The cost of the study is proposed to be $27,750 <br />(unchanged from September, 2006), which would be financed equally from the water and <br />sewer funds. A copy of the proposal is attached for your review. Staff is recommending <br />engaging Springsted, Inc. to complete this study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.