My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/18/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
04/18/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2014 2:20:34 PM
Creation date
3/11/2014 1:35:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/18/2011
Council Meeting Type
Work Session Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street Reconstruction Programs <br />Cambridge, Minn. (2001 -2011) <br />An annual program consisting of approximately 12 miles to date, a total cost <br />of $23 million, with no cost overruns. Included the entire downtown <br />business area and significant residential areas. Funding has included <br />Municipal State Aid, Trunk Highway Turnback, Federal SAFTEA -LU, and <br />significant special assessments. Todd's SEH team performed a Pavement <br />Management Study, prepared a Capital Improvement Plan (CIP), annually updates the CIP, prepared and <br />updates the assessment policy, and implements annual street and utility reconstruction projects from <br />preliminary design through construction. <br />Reference <br />David L. Carlberg <br />Community Development <br />Director <br />763.689.3211 <br />Oakdale, Minn. (1994 -2011) <br />SEH implements an annual program <br />consisting of approximately 45 miles to date, <br />and a total cost over $30 million. <br />The projects have included commercial, <br />residential, and City park improvements <br />with funding coordination required for <br />Municipal State Aid, Federal Safe Routes to <br />School, Federal SAFTEA -LU, Federal <br />Stimulus funding, and significant special <br />assessments (more than 700 parcels on <br />current project). <br />Todd's team has provided design and <br />construction services for this entire program. <br />Reference <br />Brian Bachmeier, PE <br />City Engineer /Director of <br />Public Works <br />651.739.5086 <br />City of Lino Lakes • City Engineering Services I page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.