Laserfiche WebLink
AIT CUP — Materials Storage (6497 12th Avenue South) <br />Page 7 of 7 <br />22. Snow fence will be installed along both sides of the haul route <br />through Birch Park. <br />23. The haul route through Birch Park will have the topsoil replaced <br />and hydro seeded at the developer's expense. <br />24. The stockpile area will be limited to a maximum of 25 feet high. <br />25. Areas that will not be worked on within 48 hours are required to be <br />hydro - seeded. <br />This review is based on the following plans and information: <br />1. Site Plan, Received May 31, 2007 <br />2. Memo, Dated April 23, 2007 <br />• <br />