Laserfiche WebLink
G. Election November 6, 2007 <br />• Must hold an election within 120 days after close of public hearing <br />(Note: July 9, 2007 to November 6, 2007 = 120 Days) <br />H, Authorize Improvement Project & Preparation of Plans /Specifications December 2007 <br />I. Hold Neighborhood Meetings Ongoing 2008 <br />J. Approve Plans and Specifications and Order Advertisement for Bids Spring 2009 <br />K. Accept Bids Spring 2009 <br />L. Assessment Hearing Spring 2009 <br />M. Start Construction Spring 2009 <br />N. End Construction Fall 2009 <br />III. PROPOSED IMPROVEMENTS <br />As established in the existing 5 -year CIP, the following streets are programmed for <br />reconstruction in 2009: <br />A. 2009 CONSTRUCTION <br />1, Shenandoah Area <br />Rice Court <br />Hokah Court <br />Hokah Drive <br />Totem Trail <br />Arrowhead Drive <br />Totem Trail to Cul -de -sac <br />Hokah Drive to Cul -de -sac <br />Totem Trail to Birch Street <br />Arrowhead Drive to Birch Street <br />Ware Road to 550 feet East of Totem Trail <br />Overall, these streets are typical of many streets in the City that are over 30 years in <br />age and are reaching the end of their design life. The overall condition assessment of <br />the proposed improvement areas are further described in the following Section. <br />3 13849.004 <br />• <br />• <br />• <br />