My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/06/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
08/06/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2014 1:09:52 PM
Creation date
3/14/2014 11:13:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/06/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 8 -1 -07 <br />WATER TREATMENT PLANT <br />CITY OF LINO LAKES, MINNESOTA <br />PROJECT NO. 13843.000 <br />1 PURPOSE OF STUDY <br />TKDA has been authorized to conduct a water treatment feasibility study for the City of <br />Lino Lakes. As part of this study TKDA has reviewed the water quality information on the <br />existing wells to determine; the existing quality, the levels of iron and manganese in the <br />water, what constituents should be removed by treatment, and levels of removal. <br />As part of a separate study, TKDA had estimated the water demands for the future based <br />on the DNR policies for appropriating water and based on the ultimate population <br />projection for Lino Lakes. Using these demand projections, a plant capacity was <br />determined. <br />Blending of raw well water with the treated water on peak days was evaluated to reduce <br />the treatment plant size. With a smaller plant size, Lino Lakes' ultimate service area could <br />be served by a single water treatment plant. <br />Two potential future water treatment plant sites were studied and were used to determine <br />the best possible plant location and costs were developed for both sites. <br />A review of future storage needs, water supply, high service pumping needs, and <br />treatment plant sizing was performed based on ultimate population projections. <br />In addition, TKDA reviewed the available treatment technology and selected two types of <br />process equipment for iron and manganese removal. Two different plant layouts were <br />developed based on the space needs for this equipment. Preliminary floor plans were <br />developed and the plant site plans were developed. From this, the acreage needed for a <br />future plant site was determined. <br />After determining the plant size, locations, and layouts, cost estimates were made for the <br />two types of equipment at the two site locations. Included in these cost estimates, are the <br />raw watermains and treated water distribution mains needed for each option. From this <br />data, four cost estimates were prepared. Funding options and final recommendations for <br />these options are at the end of the report. <br />Water Treatment Plant Study 3 13843.000 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.