My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
08/13/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2014 1:25:41 PM
Creation date
3/14/2014 1:05:58 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/13/2007
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP- 2460 - 0112 -92) <br />SHEET 1 OF 2 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 2 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />• <br />The construction plans on sheets 79, 80, and 81 of 198 show the location of the median islands that are to be constructed <br />on C.S.A.H. 23. At the request of the City of Lino Lakes, the median construction is eliminating the four (4) inch concrete <br />walk and replacing it with an irrigated landscape system. <br />This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to construct the above <br />stated irrigated landscape system. By signing this Change Order, the Contractor acknowledges receipt of one plan <br />containing four (4) 11 X 17 sheets depicting the redesign of the C.S.A.H. 23 median islands. <br />All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn /DOT Standard <br />Specifications, Mn/DOT Standard Plates and as directed by the Engineer. <br />Payment to the Contractor for this work will be at the negotiated prices, as shown below in the Estimate of Cost. <br />Decrease - Negotiated Items <br />Item No. Description <br />2521.501 4" Conc. Walk <br />ESTIMATE OF COST <br />Unit Quantity Unit Price Amount <br />S.F. 23,758 $ 2.25 $53,455.50 <br />Subtotal Decrease $53,455.50 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.