My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/05/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
09/05/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 1:49:38 PM
Creation date
3/17/2014 11:02:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/05/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER TREATMENT PLANT <br />CITY OF LINO LAKES, MINNESOTA <br />PROJECT NO. 13843.000 <br />TABLE OF CONTENTS <br />DRAFT 8 -17 -07 <br />PAGE NO. <br />SECTION I. PURPOSE OF STUDY 1 <br />SECTION II. <br />SECTION III. <br />SECTION IV. <br />SECTION V. <br />SECTION VI. <br />SECTION VII. <br />SECTION VIII. <br />SECTION IX. <br />SECTION X. <br />SECTION XI. <br />SECTION XII. <br />SECTION XIII. <br />SECTION XIV. <br />TABLE 1 <br />TABLE 2 <br />TABLE 3 <br />TABLE 4 <br />TABLE 5 <br />TABLE 6 <br />TABLE 7 <br />TABLE 8 <br />TABLE 9 <br />TABLE 10 <br />WATER QUALITY INFORMATION AND COMPLAINTS 2 <br />FUTURE WATER DEMANDS FOR LINO LAKES 4 <br />POTENTIAL TREATMENT PLANT SITES 6 <br />FUTURE WATER STORAGE NEEDS AND OPTIONS 7 <br />FUTURE BOOSTER STATION NEEDS 8 <br />FUTURE WATER PLANT SIZE (BLENDING) 10 <br />WATER PLANT OPTIONAL PROCESSES 12 <br />FLOOR PLAN OPTIONS, SECTIONAL VIEW OF PLANT, AND SITE PLAN 15 <br />WATERMAIN AND FUTURE WELL NEEDS FOR EACH OPTION 16 <br />COST ESTIMATE FOR EACH OPTION 17 <br />POSSIBLE FUNDING OPTIONS 22 <br />SUMMARY OF FINDINGS 23 <br />FUTURE CAPITAL PROGRAM 26 <br />WELL WATER AND MANGANESE DATA 3 <br />ULTIMATE WATER USE CALCULATIONS 5 <br />HIGH SERVICE PUMPS 8 <br />WATER DEMAND PROJECTIONS 11 <br />COST ESTIMATE SUMMARY 17 <br />COST ESTIMATE FOR RAW WATERMAIN TO WEST SITE 18 <br />COST ESTIMATE FOR RAW WATERMAIN TO EAST SITE 19 <br />COST ESTIMATE FOR GRAVITY FILTERS 20 <br />COST ESTIMATE FOR PRESSURE FILTERS 21 <br />FUTURE CAPITAL PROGRAM 26 <br />ii 13843.000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.