Laserfiche WebLink
DRAFT 8 -17 -07 <br />IV. POTENTIAL TREATMENT PLANT SITES <br />In meeting with Lino Lakes staff, three potential sites were offered by staff for a water <br />treatment plant. All three sites were along Birch Street where most of the City's wells will <br />be drilled. The construction of the water treatment and storage facilities in close proximity <br />to the wells will lower the raw watermain construction costs. <br />The site at Wellhouse No. 3 looked like a costly and difficult site for construction of a water <br />treatment plant and water storage tank because of the limited area to build upon and it is <br />surrounded by water and low areas. Therefore, only two sites were used as potential future <br />plant sites. One site is along Centerville Road at Birch Street. The other site is School <br />District property along Birch Street, West of Timberlake Trail. Soil borings were taken at <br />each site to determine structural foundation needs, water table depth, and maximum <br />foundation depth for a future reservoir. These sites were then used to develop a site plan, <br />raw watermain requirements and a cost estimate to build a water plant at each site. <br />Water Treatment Plant Study 6 13843.000 <br />