Laserfiche WebLink
DRAFT 8 -17-07 <br />two largest high service pumps and the water treatment plant during electrical power <br />outages. <br />The standby generator will also allow the City to obtain electrical service on the load <br />management rate schedules. The electric utility provider allows the City to operate the <br />generator during peak electrical demand periods and offers lower electrical rates for <br />compensation. <br />Water Treatment Plant Study 9 13843.000 <br />