My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/10/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
09/10/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 1:59:32 PM
Creation date
3/17/2014 12:50:35 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/10/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP- 2460 -01 12 -92) <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 4 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />SHEET 1 OF 1 SHEETS <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />• <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />The aggregate test reports and material disposition forms compiled by Mn/DOT indicate that on 7 -10 -07 the <br />coarse aggregate for ready -mix concrete supplied by Cemstone Plant #7 & 17 Blaine failed to meet the <br />gradation requirements for Mn/DOT Specification 3137 CA -50. <br />This concrete was used for Br #02817 Stage I Pier Ftg. <br />Upon recommendation of the Concrete Office, the concrete contRining the deficient material will be allowed to <br />remain in place at a reduced price. The dollar amount to be deducted from the Contractor's project payable <br />monies is computed as shown below in the Estimate of Costs. <br />Decrease - Group No. #5 @ 100% <br />Description <br />Estimate of Costs <br />• <br />Unit Quantity Unit Price Amount <br />Deduct for Failing Gradation CY 39.5 - $22.00 - $869.00 <br />Lab. No. 90C <br />Total Credit this Change Order - $869.00 <br />CHANGE N CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days Issued By: <br />Is decreased ( ) by Working Days Project/Resident/County Engineer Date <br />Is increased ( ) by Calendar Days <br />Is decreased ( ) by Calendar Days Approved By: <br />City of Lino Lakes Date <br />b. Is not changed (X ) <br />c. May be revised if the work affected <br />the controlling operation ( ) <br />Approved By: <br />Anoka County Date <br />Accepted By: <br />Contractor's Authorized Representative Date <br />Original to Project Engineer; copies to Contactor, City -of Lino Lakes, Anoka County <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.