My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/24/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
09/24/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 2:13:54 PM
Creation date
3/18/2014 9:20:01 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/24/2007
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XII. POSSIBLE FUNDING OPTIONS <br />Water utility operations should be self - supporting from revenue received by providing <br />service to the customers. Due to the substantial population growth and the water quality <br />issues caused by the iron and manganese found in the supply wells, the City is <br />investigating the feasibility of providing treatment of the well water. The water treatment <br />plant complex and additional supply wells will cost approximately $16,875,000 based upon <br />2007 construction costs. This estimated cost includes engineering, administrative, and <br />construction costs. <br />We anticipate that the City of Lino Lakes will use General Obligation or Revenue bonds to <br />fund the water system improvements as it is unlikely that state revolving fund loans would <br />be available for these water system improvements. State revolving funds are generally <br />utilized to fund community projects where regulatory compliance issues are of concern. <br />Projects selected for state funding are ranked based on a priority system each year by the <br />Minnesota Department of Health. <br />The water treatment complex capital cost (including engineering, administrative, and <br />construction costs) is estimated at $12,050,000, and the wells, well houses, and <br />associated raw watermain improvements are estimated to cost $4,825,000. The cost of <br />distribution system improvements which are needed whether a treatment plant is built or <br />not are estimated at $2,895,000. As the water treatment plant would provide substantial <br />benefit for the existing water customers, which is 1/3 of the ultimate population, water rate <br />increases could be utilized to fund 1/3 of the $12,050,000 water treatment plant cost. The <br />remaining 2/3 of the water treatment plant cost and the cost of additional well supplies <br />should be recovered from water availability charges for new connections to the system. <br />The Lino Lakes City Council has authorized a more in depth study for funding the <br />treatment plant and associated facilities which will be completed separately from this study. <br />Water Treatment Plant Study 22 13843.000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.