4. CITY - FINANCED IMPROVEMENTS - NEW SUBDIVISIONS <br />In all projects which the City constructs and finances, the following security provisions shall apply: <br />A. The developer shall deposit with the City a letter of credit or cash escrow deposit of not less than <br />thirty -five percent (35 %) of the estimated project cost as determined by the City Engineer. Project <br />costs to include intemal improvements involved with the plat only. If the project costs determined <br />after receipt of bids for construction exceed the Engineer's estimate by ten percent (10 %) or more, <br />the cash escrow deposit or letter of credit shall be increased proportionately. <br />The total project cost shall be assessed in equal annual installments over a period not to exceed fifteen <br />(15) years at an interest rate of 2% over the interest rate on the project improvement bonds. The cash <br />escrow or letter of credit shall remain intact until the outstanding principal of assessments against the <br />property is equal to or less than the cash escrow or letter of credit, plus accrued interest. At such time <br />the cash escrow or letter of credit with accrued interest deposit, shall be used to pay the balance of <br />the principal outstanding. Assessments on a lot shall be paid in full within sixty days after a <br />certificate of occupancy is issued for a building on any lot whether such lot is owned by the <br />developer, his heirs, successors or assigns. <br />B. In the case where the improvements benefit not only the property being developed, but other areas <br />within the City, the developer shall provide to the City a security deposit in accordance with <br />subsection A., above for the portion of the estimated project costs which represent the benefit to the <br />proposed development. Such portion shall be assessed against the property as outlined in subsection <br />A., above. <br />C. Where trunk sanitary sewers or watermains and storm sewers are constructed to serve undeveloped <br />areas, the trunk costs and unit costs may be assessed on a per acre basis and included with the <br />assessments levied under the procedure outlined in subsection A., above. <br />D. In areas where trunk sanitary sewers or watermains are constructed to serve undeveloped areas, the <br />City may determine to assess the trunk costs by the use of unit connection charges to be paid at the <br />time building permits are issued, or at the time the lateral sewer and/or water assessment is made. <br />The City shall determine the number of sanitary sewer and/or water connections to be made in the <br />proposed development served by the trunk systems and shall require that the estimated unit charges <br />for the development be added to the estimated project cost and included in the security deposit. In <br />the event the connections are not made to the public sanitary sewer and/or water systems and the <br />charges paid by the end of the financing period, then the unit charges would be paid from the <br />available security deposit. If the funds available are not sufficient to pay the connection charges, the <br />additional cost shall be assessed against the development in equal annual installments over a period <br />of two years. <br />E. New plats will be allocated and/or assessed for a proportional share of costs for adjacent utility lines <br />and streets. <br />