My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/01/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
10/01/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 2:24:01 PM
Creation date
3/18/2014 10:18:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/01/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• Water Utility <br />4. Water Utility <br />13 <br />1 Water Rates The City has requested a review of the various water rates /fees as part of this <br />■ study. The City currently has a Water Connection Fee, Water Meter Fee, and a <br />Water Availability Charge in addition to its quarterly billing charges. <br />• <br />In general, the Water Availability Charge should be established to recover the <br />• capital cost associated with providing the necessary infrastructure to make these <br />■ services available to the customer. These should include the cost of water <br />supply, providing treatment capacity, and the cost of the distribution system. <br />This insures that growth pays for the costs that result from that growth. There <br />can be overriding public policy issues that require the City to charge less than <br />• the actual capital costs incurred to provide the service. These include, but are <br />■ not limited to, the desire to encourage business and residential development, to <br />keep charges competitive with neighboring communities, and to encourage new <br />■ customers to connect to the system for both economic and environmental <br />reasons. However, it is important to remember that to the extent availability <br />charges do not cover the costs associated with providing water services directly <br />related to growth, these costs are paid for by the Water Utility's existing <br />• customers through higher user rates. <br />The City's current Water Availability Charge is shown in the table below. <br />Per SAC Unit j Amount <br />• <br />$3,415 <br />w <br />The Availability Charge should include those portions of the existing assets <br />that will benefit new customers together with any anticipated future capital <br />■ improvements constructed for the purpose of providing utility services to new <br />customers. The capital improvements planned for the Water Utility are <br />. related primarily to the proposed water treatment facility, including wells and <br />trunk watermains. <br />■ <br />Current assets to be included in the connection fee calculation are the net assets <br />• of the utility. The net assets are determined as follows: <br />1 <br />1 <br />■ <br />Capital Assets <br />- Accumulated depreciation <br />- Outstanding debt (principal portion) <br />- Contributed capital <br />=Net Assets <br />■ Capital assets are the total assets of the utility at their acquisition cost. <br />Accumulated depreciation is subtracted to reflect the reduction in the value of <br />these assets due to their use by the utility. Outstanding debt is subtracted <br />because this will be repaid from either future user fees or availability charges. <br />• 3pringsted <br />City of Lino Lakes, Minnesota. Water and Sewer Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.