Laserfiche WebLink
• <br />• <br />1 <br />• <br />i <br />• <br />1 <br />$ <br />• <br />• <br />1 <br />1 <br />• <br />• <br />1 <br />1 <br />• <br />1 <br />• <br />1 <br />• <br />• <br />• <br />• <br />• <br />• <br />1 <br />• <br />■ <br />• <br />• <br />Water Utility <br />22 <br />Capital Outlay <br />Springsted <br />To determine the appropriate fees and rates needed for the operation of the <br />Water Utility over the planning period, we have incorporated the anticipated <br />future capital outlay needs provided by the Finance Director and City Engineer. <br />These capital costs and their projected source of funding are shown in the <br />table below. The capital items are projected to be paid from both the Water <br />Utility Fund and the Area and Unit Charge Fund. All water and sewer trunk <br />charges are deposited into the Area and Unit Charge Fund, in addition to the <br />$10 quarterly fee imposed on all water users. <br />The capital improvements planned for the Water Utility are related primarily <br />to the proposed water treatment facility. The capital outlay projected to be <br />paid from the Water Utility (shown above), is related to the water tower <br />repainting, various street improvement projects, and the water treatment plant <br />in 2017. Approximately 1/3 of the proposed water treatment plant will <br />benefit existing users and therefore the cost should be repaid primarily from <br />user fees. This amount is projected to be $4,848,706 in 2017. The remaining <br />portion, $9,697,412, is projected to be funded with G.O. Water Revenue <br />Bonds, which are projected to be repaid from trunk charge revenue. <br />Based on cash available in the fund, we have assumed a majority of the <br />capital outlay would be funded with cash from the Water Utility. In addition, <br />various transfers are projected to be made from the Water Utility to the Area <br />and Unit Charge Fund in 2011 and 2012, with repayment back to the Water <br />Utility 2013 -2015. <br />A detailed listing of the anticipated capital improvements to be paid from the <br />Water Utility Fund through 2017 as well as the Area and Unit Charge Fund <br />projections is shown on the following pages. Capital Outlay shown in the <br />Area and Unit Charge Fund also includes Sewer Utility projects. Discussion <br />of the Sewer Utility appears later in the report. <br />City of Lino Lakes, Minnesota. Water and Sewer Study <br />Water Utility <br />G.O. Water <br />Revenue Bond <br />Special <br />Assessments <br />Water <br />Area and Unit <br />Charge Fund <br />Totals <br />2007 <br />- <br />- <br />- <br />230,560 <br />230,560 <br />2008 <br />314,580 <br />- <br />- <br />- <br />314,580 <br />2009 <br />571,153 <br />- <br />698,076 <br />1,965,945 <br />3,235,175 <br />2010 <br />- <br />- <br />- <br />230,600 <br />230,600 <br />2011 <br />- <br />583,671 <br />742,854 <br />3,685,627 <br />5,012,152 <br />2012 <br />- <br />- <br />- <br />1,806,609 <br />1,806,609 <br />2013 <br />- <br />- <br />- <br />- <br />- <br />2014 <br />- <br />- <br />- <br />- <br />- <br />2015 <br />- <br />- <br />- <br />255,810 <br />255,810 <br />2016 <br />- <br />- <br />- <br />- <br />- <br />2017 <br />4,848,706 <br />9,697,412 <br />- <br />- <br />14,546,118 <br />Total <br />5,734,440 <br />10,281,083 <br />1,440,930 <br />8,175,151 <br />25,631,604 <br />The capital improvements planned for the Water Utility are related primarily <br />to the proposed water treatment facility. The capital outlay projected to be <br />paid from the Water Utility (shown above), is related to the water tower <br />repainting, various street improvement projects, and the water treatment plant <br />in 2017. Approximately 1/3 of the proposed water treatment plant will <br />benefit existing users and therefore the cost should be repaid primarily from <br />user fees. This amount is projected to be $4,848,706 in 2017. The remaining <br />portion, $9,697,412, is projected to be funded with G.O. Water Revenue <br />Bonds, which are projected to be repaid from trunk charge revenue. <br />Based on cash available in the fund, we have assumed a majority of the <br />capital outlay would be funded with cash from the Water Utility. In addition, <br />various transfers are projected to be made from the Water Utility to the Area <br />and Unit Charge Fund in 2011 and 2012, with repayment back to the Water <br />Utility 2013 -2015. <br />A detailed listing of the anticipated capital improvements to be paid from the <br />Water Utility Fund through 2017 as well as the Area and Unit Charge Fund <br />projections is shown on the following pages. Capital Outlay shown in the <br />Area and Unit Charge Fund also includes Sewer Utility projects. Discussion <br />of the Sewer Utility appears later in the report. <br />City of Lino Lakes, Minnesota. Water and Sewer Study <br />