My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/01/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
10/01/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 2:24:01 PM
Creation date
3/18/2014 10:18:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/01/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />1 <br />■ <br />• <br />■ <br />• <br />■ <br />• <br />• <br />• <br />Sewer Utility <br />30 <br />Sewer Customer <br />Growth Projections <br />The projection of residential sewer connections is the same as projected <br />new water connections. The projected number of added sewer connections <br />over the planning period is as follows: <br />Sewer Utility Revenue Revenue requirements indicate the amount of revenue needed for the City to <br />Requirements continue efficient operations as well as maintain an adequate cash balance in <br />the utility. The following page shows the projected operating statement and <br />■ annual cash balance in the Sewer Utility, assuming no rate increases, over the <br />planning period 2007 -2017. <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />1 <br />• <br />• <br />• <br />• <br />1 <br />✓ <br />1 <br />■ <br />Springsted <br />• <br />Operating income is projected to become negative in 2014 and remain negative <br />through the end of the planning period. The projected ending cash balance in <br />2017 is $8,353,512. Sewer utility projections through 2017 without any rate <br />increases are shown on the following pages. <br />City of Lino Lakes, Minnesota. Water and Sewer Study <br />Population <br />New Units <br />Projections <br />Change <br />per Year <br />2006 <br />20,290 <br />2010 <br />21,500 <br />1,210 <br />101 <br />2020 <br />26,500 <br />5,000 <br />167 <br />2030 <br />31,000 <br />4,500 <br />150 <br />ultimate <br />42,000 <br />11,000 <br />147 <br />Sewer Utility Revenue Revenue requirements indicate the amount of revenue needed for the City to <br />Requirements continue efficient operations as well as maintain an adequate cash balance in <br />the utility. The following page shows the projected operating statement and <br />■ annual cash balance in the Sewer Utility, assuming no rate increases, over the <br />planning period 2007 -2017. <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />1 <br />• <br />• <br />• <br />• <br />1 <br />✓ <br />1 <br />■ <br />Springsted <br />• <br />Operating income is projected to become negative in 2014 and remain negative <br />through the end of the planning period. The projected ending cash balance in <br />2017 is $8,353,512. Sewer utility projections through 2017 without any rate <br />increases are shown on the following pages. <br />City of Lino Lakes, Minnesota. Water and Sewer Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.