Laserfiche WebLink
• <br />• <br />• <br />WS — Item 10. <br />WORK SESSION STAFF REPORT <br />Work Session Item 10. <br />Date: November 5, 2007 <br />To: City Council <br />From: James E. Studenski, City Engineer <br />Re: West Oaks — Petition to Pursue the Extension of Sewer and Water <br />Background <br />A petition to pursue the extension of sanitary sewer and water was submitted by the <br />residents of West Oaks subdivision in the south east corner of the City as shown on the <br />attached map. The attached petition received October 25, 2007 by the City contains 30 <br />signatures from 28 properties. All signatures have been verified by the City Clerk. The <br />properties on the petition represent 47% or 28 of the 59 single family residential lots in <br />the West Oaks Subdivision. <br />During the summer of 2006 White Bear Township extended a low pressure sanitary <br />sewer and watermain system to the northern limits of the Township just south of County <br />Road J as shown on the attached map. As directed by the City Council at the <br />March 6, 2006 work session, the White Bear Township project was designed to service <br />the properties in Lino Lakes shown outlined in orange on the attached map. <br />The West Oaks area is defined as Low Density Unsewered Residential; it is outside the <br />staged growth area and is outside the MUSA boundary. Street reconstruction is not <br />scheduled for this area in the five year plan and the Pavement Management <br />Improvements of the streets are shown on the attached map. <br />A feasibility study will need to be prepared for this area to determine on a preliminary <br />basis, design, cost , assessment amounts, schedule, and other details related to providing <br />City Utilities to the West Oaks area <br />1 <br />