My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/05/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
11/05/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 1:51:21 PM
Creation date
3/18/2014 12:44:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/05/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 2009 <br />2009 Surface Water Management Project <br />This project consists of the annual maintenance of the City's storm water conveyance <br />system. Under the National Pollutant Discharge Elimination System (NPDES) Phase II <br />permit the City is required to inspect 20% of its stormwater management infrastructure <br />and repair all identified deficiencies. The purpose of the project is to improve drainage <br />and capacity in the city's ditches and ponds and insure water quality standards are met. <br />Improvements include storm pipe, ditch and pond cleaning as well as pipe and catch <br />basin replacements. <br />The estimated project cost is $175,000. The project is proposed to be funded by the <br />City's general fund. <br />2009 Street Sealcoat and Overlay Project <br />This project consists of the annual maintenance of the City's Street system. The purpose <br />of the project is in a cost effective manner to preserve and lengthen the life expectancy of <br />City Streets in accordance with the City's Pavement Management Plan. Improvements <br />include crack sealing, seal coating and bituminous overlays of municipal streets <br />• The estimated project cost is $402,500. The project is proposed to be funded by the <br />City's general fund. <br />• <br />2009 Street Reconstruction Project <br />This project involves the reconstruction of West Shadow Lake Drive, Shadow Court and <br />Sandpiper Drive, including the extension of sanitary sewer and water services. <br />The estimated project cost is approximately $5,583,000. The project is proposed to be <br />funded from special assessments, trunk utility funds, and property tax levy. Project <br />approval is subject to voter referendum in 2007. <br />2009 Trunk Watermain Improvements <br />This project includes the extension of Trunk Watermain from Black Duck Drive to Aqua <br />Lane through the Rice Creek Chain of Lakes Regional Park. The project was identified <br />in the City's 2003 Water Plan to establish a looped system between the NW and South <br />quadrants of the City. <br />The estimated project cost is $750,000. The project is proposed to be funded by Trunk <br />Utility Funds. <br />CI -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.