My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/17/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
12/17/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 2:27:48 PM
Creation date
3/20/2014 9:10:37 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/17/2007
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 1(F) <br />•ANDHILL DRIVE STORM SEWER REMOVAL, CLEANING, AND REINSTALLATION <br />TY OF LINO LAKES, MINNESOTA <br />i KDA PROJECT NO. 13849.002 <br />PERIOD ENDING: November 6, 2007 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />SANITARY SEWER <br />1 MOBILIZATION LS 1 1.0 $ 525.00 $ 525.00 <br />2 REMOVE CONCRETE CURB AND GUTTER LF 120 82.0 $ 2.10 $ 172.20 <br />3 REMOVE BITUMINOUS SY 193 130.0 $ 3.00 $ 390.00 <br />4 GRUB STUMPS EA 9 9.0 $ 30.00 $ 270.00 <br />5 SALVAGE/RESPREAD TOPSOIL LS 1 1.0 $ 425.00 $ 425.00 <br />6 REMOVE/CLEAN/RELAY 300 LF 30" RCP LF 300 300.0 $ 57.50 $ 17,250.00 <br />7 ROCK TRENCH STABILIZATION (1' DEPTH) CY 290 186.0 $ 40.00 $ 7,440.00 <br />8 ROD ALL PIPE JOINTS (LAST 3 AT FES MAY ALREADY BE DONE) LS 1 $ 3,050.00 <br />1.0 $ 3,050.00 <br />9 WRAP ALL PIPE JOINTS WITH FABRIC LS 1 1.0 $ 210.00 $ 210.00 <br />10 CLEAN OUT POND AREA AT FES (WASTE MATERIAL ON SITE) EA 6 6 0 $ 80.00 $ 480.00 <br />11 PLACE 1 -112" ROCK AT OUTFALLS (SEE DETAIL) CY 14 14.0 $ 42.00 $ 588.00 <br />12 CLASS 5 TN 70 120.0 $ 22.0D $ 2,640.00 <br />13 EROSION CONTROL BLANKET AT FES (EROSION LOGS) EA 6 - $ 80.00 $ <br />14 WORK ZONE SIGNAGE - NOTIFY HOMES 24 HRS. BEFORE <br />START LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL BASE BID $ 33,940.20 <br />CHANGE ORDER N0. 1 <br />01 8 -FOOT SECTION OF 30" RCP EA 5.0 5.D $ 365.40 $ 1,827.00 <br />2 30" FLARED END SECTION EA 1.0 1.0 $ 590.00 $ 590.00 <br />3 ADDITIONAL TIE RODS - MATERIAL LS 1.0 1.0 $ 1,163.00 $ 1,163.0D <br />4 ADDITIONAL TIE RODS - LABOR LS 1.0 1.D $ 1,200.00 $ 1,200.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 4,780.00 <br />TOTAL PAY ESTIMATE NO. 1(F) $ 38,720.20 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.