Laserfiche WebLink
• <br />• <br />• <br />water during a flood event. Bank stabilization and erosion control <br />measures will be installed to aid in the protection of the bridge from <br />flood damage. <br />5. The importance of the services provided by the proposed facility <br />to the community; <br />The bridges allow customers of the Chomonix Golf Course to access <br />the northern holes. <br />6. The requirement of the facility for a waterfront location; <br />The Chomonix Golf Course was built around Rice Creek about 25 <br />years ago to utilize the natural features as part of the golf course <br />design. <br />7. The availability of alternative locations not subject to flooding for <br />the proposed use; <br />Rice Creek bisects the golf course and the 100 year floodplain <br />follows Rice Creek causing the golf course to either be surrounded <br />by or within the 100 year floodplain. This makes alternative locations <br />not feasible. <br />8. The compatibility of the proposed use with the existing <br />development and development anticipated in the foreseeable future; <br />The replacement of existing pedestrian bridges is compatible with <br />the existing County Park Golf Course. <br />9. The relationship of the proposed use to the comprehensive plan <br />and the Lino Lakes local water management plan; <br />The bridges are being constructed in a County Park. <br />10. The safety of access to the property in times of flood for ordinary <br />and emergency vehicles; <br />The majority of the golf course has an elevation below the 100 year <br />flood elevation. Making the golf course inaccessible during 100 year <br />and other minor flood events. <br />11. The expected heights, velocity, duration, rate of rise, and <br />sediment transport of the floodwaters expected at the site; and <br />Construction of replacement bridges at Chomonix Golf Course <br />35_ <br />Pane 5 of 13 <br />