Laserfiche WebLink
• <br />• <br />• <br />(5) Fill. <br />(a) Any fill deposited in the Flood Plain Overlay District shall be no more <br />than the minimum amount necessary to conduct a conditional use listed in § <br />1103.07(2). <br />(c) Fill shall be protected from erosion by vegetative cover. An erosion <br />and sedimentation plan shall be required for any fill in excess of 1,000 cubic <br />yards. <br />(8) Public transportation facilities. <br />(a) Railroad tracks, roads and bridges to be located within the Flood <br />Plain Overlay District shall comply with division (1) above. <br />(b) Elevation to the regulatory flood protection elevation shall be <br />provided where failure or interruption of public transportation facilities would <br />result in danger to the public health or safety or where the facilities are essential <br />to the orderly functioning of the area <br />Conditional Use Permit <br />These are general criteria that apply for all Conditional Use Permits that apply to <br />Earth Moving and Land Reclamation. <br />General Criteria: <br />Section 2 Subdivision 2.B.7 of the zoning ordinance lists the general criteria that <br />apply to all Conditional Use Permits. The Planning and Zoning Board shall <br />recommend a conditional use permit and the City Council shall order the <br />issuance of such permit only if it finds the following criteria have been met. <br />7. Standards. The Planning and Zoning Board shall recommend a conditional <br />use permit and the Council shall order the issuance of such permit only if it finds <br />the following criteria have been met: <br />a. The proposed development application has been found to be consistent with <br />the policies and recommendations of the Lino Lakes Comprehensive Plan <br />including: <br />1) Land Use Plan. <br />2) Transportation Plan. <br />3) Utility (Sewer and Water) Plans. <br />4) Local Water Management Plan. <br />5) Capital Improvement Plan. <br />6) Policy Plan. <br />7) Natural Environment Plan. <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 7 of 13 <br />—37— <br />