My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/01/2010 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2010
>
03/01/2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2014 3:31:07 PM
Creation date
3/21/2014 10:05:28 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/01/2010
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111(31EN CONFIDENTIAL <br />February 23, 2010 <br />Mr. Terrance Heiser <br />Network Manager <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Re: BTOP Round 2 Comprehensive Co unity Infrastructure Project <br />Dear Terre, <br />American Fiber Systems, Inc. (AFS) is pleased to present you with the following <br />summary of the ARRAiNTIA/BTOP Comprehensive Community Infrastructure (CCI) <br />for providing connectivity to the facilities of the identified communities in Ramsey <br />County and the southern portion of Anoka County. <br />The Round 2 application route that AFS is proposing is designed to provide multiple ring <br />architectures for all the identified buildings plus it incorporates the INET route while <br />providing ring architecture for the INET route end points. All of the Anchor Institution <br />buildings provided by you will be connected to the main backbone with fiber including <br />penetration into the building with a fiber panel. The only exception to the laterals for the <br />buildings connected is the buildings that are on the INET route which are already on-net <br />through INET or the two occurrences where the communities have connected' their <br />libraries and public safety facilities. AFS will provide three pair of dark fibers to each <br />community plus configure them to the meet the community requirements and also <br />provide an additional three pairs on the entire route for connectivity to meet the needs of <br />INET and the communities. Additionally. AFS will provide three pair of fibers that will <br />be connected to the project route along our existing AFS network spanning Minneapolis <br />and St. Paul. AFS proposes that these dark fiber strands be contractually provided under <br />a no charge IRU, except for maintenance, for an initial term of 30 years with an option <br />for an additional 30 year term. <br />To meet the needs of the BP/CCI application, AFS is considering adding buildings <br />that would connect Community Colleges and possibly the awarded University of <br />Minnesota Public Computing Center (PCC) grant from Round 1. <br />The estimated total project costs for this route is $8,068.680 excluding any additions for <br />Community Colleges or the University of Minnesota PCC facilities. If there is a need to <br />connect a few county or other facilities, AFS is willing to include them in the current <br />estimated total project cost. AFS will solely provide all necessary matching funds to <br />meet the needs of the BTOP/CCI application requirements. <br />American Fiber Systems, Inc. <br />100 Meridian Centre, Suite 300, Rochester. New York 14618 <br />Mobile: (585) 721 2815, Phone: (585) 785-5815, Fax. (585) 785-5816 <br />wwv—AFSNetworks coin <br />
The URL can be used to link to this page
Your browser does not support the video tag.