Laserfiche WebLink
Lino Lakes Storm Water Utility Budget <br />2/15/2006 <br />2007 2008 2009 2010 2011 <br />Sweeping /Cleaning /Repairs 85,000 90,000 95,000 100,000 105,000 <br />Equipment (1) 42,500 44,625 46,856 49,199 51,659 <br />Personnel - 1.5 GMW 95,000 99,750 104,738 109,974 115,473 <br />SWM Projects 50,000 51,500 53,045 54,636 56,275 <br />Pipe Inspections /maint 50,000 51,500 53,045 54,636 56,275 <br />Ditch & Pond Cleaning 50,000 51,500 53,045 54,636 56,275 <br />Street Reconstruction (2) 525,000 540,750 556,973 573,682 590,892 <br />NPDES Requirements 25,000 25,000 25,000 25,000 25,000 <br />Total Budget 922,500 954,625 987,701 1,021,764 1,056,851 <br />1) Equipment Needs <br />Sweeper 135,000 Average Budget: = 988,688 <br />Jetter /Vac - 1/2 of cost 140,000 <br />Single Axle Dump 150,000 <br />425,000 <br />Estimated 10 service life /10 <br />Annualized cost 42,500 <br />2) Avg. Storm Sewer portion of Street Reconstruction per PMP <br />The above example assumes 100% funding of the storm water costs of the forecasted street reconstruction by <br />the Storm Water Utility. <br />Feasibility Study A- LINOL0602.00 <br />City of Lino Lakes, Minnesota <br />