Laserfiche WebLink
COMPENSATING CHANGE ORDER NO. 1 <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />•CITY OF LINO LAKES, MINNESOTA <br />TKD <. PROJECT ND_ 14252.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING May 25. 2010 <br />CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT <br />UNIT QUANTITY TO DATE PRICE TD DATE CHANGE AMOUNT <br />PROJECT 11 - DIANE STREET <br />1 MOBILIZATION LS 1 1.D $ 500.00 5 500.0D 5 - $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 6 500.00 5 5 500.00 <br />3 CLEAN STORM SEWER PIPE LF 50 50.6 6 10.00 5 500.00 6 6 500.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER,) EA 2 2.0 $ 200.00 5 400.00 $ $ 400.00 <br />5 REGRADE DITCH LF 30 30.0 $ 30.0D 6 900.00 5 6 900.00 <br />6 SEED / RESTORATION LS 1 1.0 $ 500.00 5 500.00 6 - $ 500.0C <br />SUBTOTAL PROJECT 11 5 3.300.00 5 5 2,300.00 <br />PROJECT 12 - COUNTRY LANE <br />1 MOBILIZATION <br />2 SALVAGE AND REINSTALL SPLIT RAIL FENCE <br />3 CLEAN /OPEN STORM SEWER OUTFALL <br />4 EXCAVATION AND GRADING <br />5 CLEAN STORM SEWER PIPE <br />6 SEED / RESTORATION <br />SUBTOTAL PROJECT 12 <br />SUBTOTAL ESTIMATE NO. 2 <br />LS 1 1.0 5 500.00 5 500.00 $ - 6 500.00 <br />LF 30 10.0 $ 10.00 5 100.00 6 (200.00) $ 300.00 <br />EA 1 1.D 6 500.00 5 500.00 5 - $ 500.00 <br />CY 15 15.0 $ 70.00 5 1.050.00 5 $ 1,050.00 <br />LF 20D 200.0 5 10.00 $ 2,000.00 6 5 2,000.00 <br />LS 1 1.0 5 500.00 6 500.00 5 - 5 500.00 <br />5 4,650.00 5 (200.00) 5 4.850.00 <br />5 85.485.06 5 (11.404.00) 5 95.89000 <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING <br />2 CLEAN /OPEN STORM SEWER OUTFALL <br />5 REGRADE DITCH <br />SUBTOTAL PROJECT 4 <br />0 PROJECT 6- APOLLO MEADOWSTDWNHOMES <br />9 CLEAR AND GRUB TREE (4" DIA OR GREATER) <br />10 COMMON BORROW (FILL OVER PIPE) <br />SUBTOTAL PROJECT 6 <br />PROJECT 7 - LOIS LANE <br />10 CLEAN 'STORM SEWER PIPE <br />SUBTOTAL PROJECT 7 <br />EA <br />LF <br />1 0.0 5 (500.00) 5 <br />15D 0.0 5 (25.00) 5 <br />5 <br />5 - 5 (500.01 <br />5 - 5 (3,750.01 <br />6 4,250.00 5 (4.250.01 <br />EA 2 2.0 5 200.00 5 400.00 5 $ 400.01 <br />CY 48 45.0 5 10.00 5 480.00 5 6 480.01 <br />5 880.00 5 880.01 <br />PROJECT B - BLACKBIRD LANE <br />9 EROSION CONTROL BLANKET CATEGORY 3 <br />SUBTOTAL PROJECT 8 <br />PROJECT 19 -JAMES STREET <br />7 CLASS 19 RIPRAP W/ FABRIC <br />SUBTOTAL PROJECT 10 <br />PROJECT 13 - BIRCH STREET TRENCH DRAIN <br />1 INSTALL TRENCH DRAIN IN CONCRETE <br />2 CLASS 11 RIPRAP W/ FABRIC <br />SUBTOTAL PROJECT 13 <br />• <br />LF 50 50.D $ 10.00 5 500.00 5 5 500.01 <br />5 500.00 $ 500.01 <br />SY 60 6D.D 5 2.00 5 120.00 5 <br />5 120.06 <br />$ 120.0' <br />5 120.0 <br />CY 2 2.0 $ 150.00 5 300.00 5 5 3D0.0 'P <br />5 300.00 5 300.0 <br />LS 1 1.D 5 4,500.00 5 4,500.00 $ 4,500.0 <br />CY 5 5.D 5 100.00 5 500.00 5 500.0 <br />5 0.000.00 5 5,000.0 <br />SUBTOTAL CHANGE ORDER NO. 1 5 5.600.00 5 4250.00 5 2.550.0 <br />TOTAL COMPENSATING CHANGE ORDER ND. 1 <br />5 92,285.00 5 (7.154.00) 5 95,440.0 <br />