My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/06/2010 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2010
>
07/06/2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 2:59:05 PM
Creation date
3/26/2014 12:49:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/06/2010
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Attachment 2: Landscaping and Tree Preservation Standards - REVISED JUNE 21, 2010 Page 10 <br />adequate thickness, once plants grow together there is often need for little or no <br />mulch. Mulch shall comply with the following requirements: <br />a) Provide mulch at a depth of 3 -4" for wood chips, 4 -6" for shredded bark and 3 -4" <br />for rocks or other non - organic matter. <br />b) Provide a 3' minimum diameter mulch ring at the base of trees. <br />c) Prohibit mounding mulch at the bases of trees, or allowing mulch within 4" of <br />plant stems and trunks, as this will cause them to rot. <br />d) If used, only water permeable fabric is permitted as a weed barrier. <br />e) Leave one inch of space from the top of the mulch layer to adjacent hardscape <br />surfaces to prevent spilling. <br />f) The City may limit certain types of mulch in areas where safety or spilling may be <br />an issue. <br />Mulch should not be mixed with underlying soil. <br />g) <br />4) Fertilizer: When fertilizer is used, organic and slow release fertilizers are <br />recommended. <br />5) Drainage: Tree planting pits shall drain adequately. Drainage for trees may be <br />accomplished through the use of non - compacted and well draining soils. The City <br />may require the following drainage test: Dig 8" diameter holes 1' deep and fill with <br />water. If the holes do not drain within 24 hours adjust bed design or composition in <br />order to achieve proper drainage. If the underlying soils retain water, the applicant <br />shall provide additional drainage measures. <br />6) Tree protection after construction: Bollards, barriers, or spacing may be necessary <br />to protect trees from cars. Bike parking should be included to discourage locking <br />bikes to trees. For tree protection during construction see Section Q.15. <br />c. Tree and Infrastructure Placement: Tree placement should be given consideration when <br />locating overhead and underground utilities. Service utilities should be located outside of <br />plant beds where they may conflict with tree plantings. Consider using conduits for <br />buried utilities to allow future work with less disruption to roots. The clearances in the <br />following table are recommended from the center of the tree trunk to avoid future <br />conflicts: <br />Utility <br />Distance to Center of Tree <br />Lights, Utility Poles, Fire Hydrants <br />10' <br />Water, Sanitary, Storm and Gas lines <br />6' from the center of the line. <br />Conduit for dry utilities (electric, cable) <br />3' <br />Utility clean outs and access points <br />3' <br />Overhead utility lines (consult utility <br />company for additional requirements) <br />5' to mature tree canopy (may require <br />trimming, topping is prohibited, see <br />Section Q.10.f) <br />
The URL can be used to link to this page
Your browser does not support the video tag.