Laserfiche WebLink
NORTHWEST CORNER, OF • <br />SJ0THEAST OLIAFTER <br />Fr. 1E <br />oC° 005 a O /b Nf ..TH`4JE Of THE SOUTHEAST <br />900 <br />901 <br />2 <br />14 <br />899 <br />��VARY SLOPES_?. <br />hnros Fhw'a`6R3— <br />00 <br />„9 , <br />DFD4 <br />II I(EE <br />;:c!dEidTl. <br />Net r4;P•m.iz <br />POSSIBLE <br />FUTURE <br />BUILDING <br />FILL <br />DITCH <br />S •PE <br />' I <br />.T IN <br />'(PAINAG <br />AND <br />1 LiTILITr <br />A :EI•!ENIT <br />® FFE 907.00 <br />TAN <br />WALL <br />% <br />I sB�Cc <br />so <br />330307 <br />(0)03E0 T <br />ROD <br />\\ <br />E. <I�TINI, <br />-.— DFAIIJAGE o04 <br />AND <br />UTILITY <br />EA.-EMENT <br />9052 <br />53.] <br />PP0P0'ED.' <br />DRAINAGE' <br />EA0.EIHENT <br />906 <br />000308>ED <br />DFAINAGE' <br />EASEMENT <br />PROPOSED <br />ROAD <br />RIGHT OF BEGIN a3az <br />WAY CON'_TRLN_TIOf! <br />• <br />903 <br />902 e <br />I EIISTII'0 <br />1 8130)1.10G0 <br />ANL: <br />UTILITY <br />EATIME , <br />j `454 <br />90 <br />904 <br />E6ISTI8 <br />DRAINAGE <br />- AND' <br />UT IL I 'Y <br />EASEMENT <br />_— <br />BEGIN <br />iCOPICTRUCTION <br />vq <br />9p6 O( C. <br />GRADING NOTES <br />PROPOSED CONTOURS REPRESENT FINISHED SURFACE ELEVATIONS. SPOT <br />ELEVATIONS ALONG PROPOSED CURB DENOTE GUTIERLINE. <br />EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON RECORD <br />DRAWINGS AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. <br />THE INFORMATION 15 NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. <br />CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANIES AT <br />LEAST 48 HOURS PRIOR TO EXCAVATION. TO RE0UE5T EXACT FIELD <br />LOCATION OF UTILITIE5. THE CONTRACTOR 15 RESPONSIBLE FOR <br />RELOCATING ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED <br />IMPROVEMENTS SHOWN ON THE PLANS. <br />CONTRACTOR TO CALL GOPHER STATE ONE CALL (1- 800 - 252 -1166) 48 <br />HOURS PRIOR TO EXCAVATION FOR LOCATIONS OF UTILITIES. <br />CONTRACTOR REOUIREO TO PROTECT THE TREES TO BE SAVED. SHOULD <br />ANY PORTION OF 190 TREE BRANCHES REQUIRE REMOVAL TO PERMIT <br />OPERATION OF THE CONTRACTOR'S EQUIPMENT, THE CONTRACTOR SHALL <br />OBTAIN THE 5089005 OF A PROFESSIONAL TRIMMING SERVICE TO TRIM THE <br />TREES. SHOULD THE CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING <br />OF ANY LIMBS, THE 8ROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND <br />CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY LASTING DAMAGE. <br />NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER_ <br />COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE <br />GRADING CONTRACT. <br />CONTRACTOR SHALL STRIP, STOCKPILE AND RE— SPREAD SUFFICIENT TOPSOIL <br />TO PROVIDE A MINIMUM FOUR INCH DEPTH TO ALL DISTURBED AREAS TO BE <br />SODDED OR SEEDED. <br />THE FINISHED BUILDING SUBGRADE ELEVATION SHALL NOT VARY BY MORE <br />THAN 0.10 FEET ABOVE OR BELOW THE PROPOSED ELEVATION. STREET OR <br />PARKING AREA SUBGRADE ELEVATION SHALL NOT VARY BY MORE THAN <br />0.05 FEET ABOVE OR BELOW THE PRESCRIBED ELEVATION AREAS TO <br />RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.10 FEET OF THE REQUIRED <br />ELEVATION UNLESS DIRECTED OTHERWISE BY THE ENGINEER. TOPSOIL SHALL <br />BE GRADED TO WITHIN 14 INCH OF THE SPECIFIED THICKNESS. <br />THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE <br />MINNESOTA POLLUTION CONTROL AGENCY — NATIONAL POLLUTANT <br />DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. CONTRACTOR SHALL BE A <br />CO— APPLICANT WITH THE OWNER. THE CONTRACTOR SHALL COMPLETE THE <br />REWIRED INSPECTION REPORTS AND BE RESPONSIBLE FOR MAINTENANCE OF <br />THE EROSION CONTROL DEVICES. <br />MAINTENANCE <br />THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM <br />TRAFFIC AND EROSION, AND KEEP AREA FREE OF TRASH AND DEBRIS. <br />CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, <br />ERODED AND RUTTED AREAS TO SPECIFIED TOLERANCES. DURING THE <br />CONSTRUCTION, IF REWIRED, AND DURING THE WARRANTY PERIOD, ERODED <br />AREAS WHERE TURF 15 TO BE ESTABLISHED. SHALL BE SEEDED AND <br />MULCHED. <br />WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY <br />SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSE WEATHER, <br />CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE AND COMPACT TO <br />REQUIRED DENSITY PRIOR TO FURTHER CONSTRUCTION. <br />AFTER SITE GRADING 15 COMPLETED. IF EXCESS OR SHORTAGE OF SOIL <br />MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS <br />MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR <br />IMPORT SUITABLE MATERIAL TO THE SITE <br />A WOOD FIBER BLANKET SHALL BE FURNISHED AND PLACED IN AREAS <br />WHERE THE SLOPE EXCEEDS 3:1. <br />THE CONTRACTOR SHALL COMPLETE DEWAIERING AS REQUIRED TO <br />COMPLETE THE 511E GRADING CONSTRUCTION. <br />THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE <br />MINNESOTA POLLUTION CONTROL AGENCY — NATIONAL POLLUTANT <br />DISCHARGE ELIMINATION SYSTEM (1PDE5) PERMIT. THE CONTRACTOR SHALL <br />BE REWIRED TO BE A CO— APPLICANT WITH THE OWNER. THE CONTRACTOR <br />SHALL COMPLETE THE 860918E0 INSPECTION REPORTS. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR MAINTENANCE OF 111E EROSION CONTROL <br />DEVICES. A COPY OF THE PERMIT CAN BE OBTAINED FROM THE ENGINEER. <br />ALL MATCH POINTS AND PAVEMENT PATCHES TO BE SAWCUT AT FULL <br />DEPTH. <br />INFILTRATION BASIN NOTES <br />GRADING SEQUENCE — ROUGH GRADING SHALL BE DONE IN CONJUNCTION <br />WITH THE REST OF THE SITE. EXCAVATE 'WITHIN 3 0.3' OF FINISHED <br />GRADE, WITH LIGHT OR RUBBER —TIRED EQUIPMENT. FINAL GRADING OF <br />BASIN SHALL BE DELAYED UNTIL REMAINDER DF SITE 15 FINISH GRADED AND <br />SEEDED. NO OVER — EXCAVATION OF BASIN AREA 15 ALLOWED. AFTER <br />FINISH GRADING, TILL THE BASIN FLOOR TO A MINIMUM DEPTH OF SIX <br />INCHES. MIX TOPSOIL WITH ON —SITE SANDY SOILS IN A RATIO OF 50/50, <br />OR AS DIRECTED BY THE ENGINEER. NO EQUIPMENT MAY BE DRIVEN <br />ACROSS THE BASIN FLOOR AFTER GRADING AND TURF ESTABLISHMENT <br />OPERATIONS ARE COMPLETE. <br />EROSION CONTROL — PLACE SILT FENCE AROUND BASIN AREA IMMEDIATELY <br />AFTER ROUGH GRADING 15 FINISHED. MAINTAIN UNTIL FINISH GRADING AND <br />TURF ESTABLISHMENT WORK IS DONE AND VEGETATION 15 65196158E0 AND <br />GROWING. <br />TURF ESTABLISHMENT — SEED WITH CITY APPROVED MIXTURE. IN <br />ACCORDANCE WITH CITY REQUIREMENTS. <br />VEGETATION IN PONDS AND 114FI11690CN AREAS SHALL BE RESTORED WITH <br />DEEP—ROOTED NATIVE VEGETATION (1.49001 MIX 310NWT OR SUITABLE <br />WETLAND SEED EQUIVALENT). RE— VEGETATION SHALL COMMENCE WITHIN 14 <br />DAYS OF FINAL GRADING. MANAGEMENT PONDS SHALL BE SEEDED WITH <br />0,001 MIX 270 PER THE 90001 2003 DISTRICT SEEDING RECOMMENDATIONS <br />PUBLICATION MEANS AND METHODS OR EQUAL APPROVED BY A LANDSCAPE <br />ARCHITECT PRIOR TO THE PURCHASE AND INSTALLATON. <br />INFILTRATION AREA TO BE GRADED TO FINAL GRACIE AFTER STAB0ZATION <br />OF UPSTREAM AREA5. <br />REMOVE ORGANIC MATERIAL 45 THE INFILTRATION AREA REPLACE WITH <br />SAND <br />JAN 0 -T 2006 <br />LEGEND <br />EXIST.; <br />NE <br />LO7 ONE <br />EDE/EalmE <br />E43MLNI ONE <br />i DDB A EDDIED <br />MINOF CONTOUR <br />SPOT EtEvANoN, <br />DD4NAGE NAPE. <br />DrODING <br />EV na4nn <br />DAP, 9 MANHOLE <br />51949.■ WNW. <br />APED Ex <br />a <br />DENOILE <br />ii,KE <br />690205E9 <br />ONO <br />0800 .eo <br />••. <br />• <br />• <br />EROSION CONTROL NOTES <br />ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO <br />COMMENCEMENT OF GRADING OPERATIONS AND BE MAINTAINED UNTIL ALL <br />DISTURBED AREAS ON THE SITE HAVE BEEN RESTORED. <br />TEMPORARY EROSION CONTROL TO BE PLACED AROUND STORM DRAIN <br />STRUCTURE AS AN INLET PROTECTION MEASURE DURING CON5180000N <br />SEE DETAIL). <br />SEDIMENT SHALL BE REMOVED FROM ALL SEDIMENT CONTROL DEVICES AS <br />NECESSARY AND MUST BE REMOVED IF DESIGN CAPACITY HAS BEEN <br />REDUCED BY FIFTY PERCENT. <br />A 5TABILI2E0 CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION MO MAINTAINED FOR DURATION OF PROJECT. <br />ROCK ENTRANCES MUST BE REPLACED OR ADDED TO IF ROCK PORE <br />SPACES BECOME FILLED. <br />CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS NOT TO BE <br />SODDED. SEEDING SHALL BE PER 44.001 SPECIFICATION 3876 APPLIED AT <br />A RAZE OF FIFTY POUNDS PER ACRE. SEEDING IN POND 960 INFILTRATION <br />AREAS SHALL BE MIXTURE 310NWT (NATIVE WET TALL) IN ACCORDANCE <br />WITH MnDOT SPECIFICATION 3876 APPLIED AT A RATE OF 82 POUNDA PER <br />ACRE. MULCH SHALL BE PER 1.10D01 SPECIFICATION 3882. TYPE 2 THE <br />MULCH SHALL BE APPLIED IN ACCORDANCE 6,1TH Mn007 SPECIFICATION <br />2575.3, F1. MULCH TO BE APPLIED AT A RATE OF TWO TONS PER ACRE. <br />MULCH SHALL BE ANCHORED WITH A DISC, CLODBUSTER OR OTHER <br />APPROVED EQUIPMENT. <br />of <br />VI O <br />N M <br />oa <br />Q U7 <br />W Eel <br />J I— 9i <br />W z <br />1na <br />7 <br />N Q <br />Z <br />10/06/05 <br />C1.0 <br />