Laserfiche WebLink
• <br />FWI H OOR <br />1 - <br />HATCH PATTERN SCHEDULE <br />e•x8• SPLIT FACE BLOCK <br />COLORED WITH DRYBLOCK <br />AND (2) COATS SEALER <br />8k16• SPLIT FACE BLOCK <br />COLORED WITH DRYBLOCK <br />AND (2) COATS SEALER <br />EIFS 1 <br />EIFS 2 <br />8 x15" FLUTED BLOCK <br />COLORED WITH DRYBLOCK <br />AND (2) COATS SEALER <br />BNB" FLUTED BLOCK <br />COLORED WITH DRYBLOCK <br />AND (2) COATS SEALER <br />STANDING <br />SEAM ROOF <br />SYSTEM <br />FINISH <br />ELEV: 100 <br />2.089 S.F. EXTERIOR INSULATION SYSTEM - (545) <br />3.900 S.F. TOTAL AREA - (1005) <br />DOWNSPOUT <br />TYP. <br />1.017 S.F. EXTERIOR INSULATION FINISH SroILM - (565) <br />1,824 S.F. TOTAL AREA - (1005) <br />TYP <br />C:J <br />MTN CIO. OIL VMS VALI. SE LBO IN RUNS. KM IALESs. ONERVBC PURIM Me <br />MCC TOOL JOINTS CONDOS FOR %%MCP IIONTNESS. 0.11PPLO. 00.01, MO NOM <br />1.11VIS Per RDNIDACINO S. WY BE ant NIS OR. SO <br />wawa,. nea gnaw. (rrn) WNW. BC INV PSI NSW. <br />PLC CORM Of INSOMPre UNDLR L WA RR LSE MS STWWATO MUSS <br />NOM OTOWNSS ON OE COVOR SACK NA= CONNO APR ORS AND A7 WSW TO LAMM WO.. WRNS WC <br />61.C. SWillec DOS WILL NW TO PROWNT ONIONSSCRICE. <br />so▪ wiLwrowo <br />S WAN 3A' 93..3' MOOR SY% AT 4.4 ON alum rN ALL 931800 -TruT9 <br />MON WO A7 TOR OF ONSOWer <br />MULL Brrox-0-1ARRES 7111w-WAX, NAMING ST II0110. WNW OF Mat MOW <br />URTIS. ARO NM SIGNO EFAIS. NSW. 11S. ONO COMB ROPE WM NOM 22i <br />COWER ALL 110.-.1 WROINS. <br />GORNERS. N-97 BLOCS COSMIC JOINTS ON COE UDC Cr OPSNWOS ISIOL OR MS MD <br />TIC SNOB SINT SWAN PALM or [ROO( MIS AS RSCWISED. <br />RP <br />WILES NOM COMM. S .WN A 2919311 <br />Or 2.0 ▪ USA, WNW a Tnuw T17.1 miB MAWA <br />WWI R-AINIE POW. COLON AS WAS= 7Nr DINA <br />MN la if. Ce. INWARD. WARD. SMALL PAOLO. FORIDWFULLY. WWI JOINS <br />ONXIXES AI ALL SOM. NORM IISOLSOCO wwwww lo PRUDE Waal TO All.Y.3017 <br />ANDS. Maui Twain ROM <br />1,858 S.F. EXTERIOR INSULATION FINISH <br />(5•5) <br />3.325 S.F. TOTAL AREA - (1005) <br />WEST ELEVATION <br />ABUTTING PROP. ZONED RES. <br />SCALE: )I••1• -0. <br />0 <br />575 S.F. EXTERIOR INSULATION FINISH Sr0ltM - (299) <br />1,954 S.F. TOTAL AREA - (1005) <br />IMF <br />C.J <br />C. <br />C.J. <br />SOUTH ELEVATION (FRONT) <br />SCALE: )C ■1' -O• <br />—J2-11/2 <br />2,153 S.F. EXTERIOR INSULATION FINISH 000/29 - (555 <br />3,900 S.F. TOTAL AREA - (1005) <br />NORTH ELEVATION <br />SCALE: 1j• -1' -0' <br />INISH 00 F�O <br />1 -ORAA <br />00'V <br />reac:�u, <br />H <br />LEV: 100 - 00 0 <br />FINISH 1 520 <br />00 <br />`- DOWNSPOUT <br />TYP. <br />FINISH F 00 <br />FINISI <br />ELEV: 1 <br />Keller <br />PLANNERS I ARCHITECTS I BUILDERS <br />MILWAUSSI <br />Owinen.ro WW1 <br />FORUM <br />1,CoRowe HISS <br />OWNS 041.7116.570 <br />FAN 02.0.706.003. <br />• <br />VAR re13•0.271.0 <br />....aolNrowa.o.m <br />MINNESOTA <br />LINO LAKES, <br />"COPYRIGHT NOTICE" <br />..o trb'P.Rr w ul <br />ha "`wo.w. <br />• ros∎ Z. in* ow1o. <br />-ITT. <br />NOT FOR CONSTRUCTION" <br />1"'"93 NWT�10; W _ <br />▪ al MIA G09 mtoOI. <br />• <br />REVISIONS <br />• <br />PROJECT MANAGER: <br />ARCHITECT: <br />DRAWN BY: <br />EXPEDITOR: <br />M. CASHMAN <br />S. KLE550 <br />G. HORN <br />SUPERVISOR: <br />FIELD LOCATE BUMPERS PREUMINARY NO <br />PER MANUFACTURER <br />DOWNSPOUT <br />EAST ELEVATION <br />ABUTTING PROP. ZONED COMM. <br />SCALE: $•.1' -0• <br />FINISH FL00RO, <br />LLEV: 96 -00 <br />CONTRACT N0: <br />I.E.D. / <br />05066 <br />ISSUED FOR CONSTRUCTION: <br />01/05/08 <br />SHEET: <br />A2.0 <br />