My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/19/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
04/19/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:20:14 PM
Creation date
4/4/2014 4:34:00 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/09/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br />IWVB <br />& Assocengineering • planning • environmental • construction <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Jason C. Wedel, PE <br />Date: April 2, 2014 <br />Re: Century Farms North 6rh Addition <br />WSB Project No. 2029-490 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />The Century Farms 6th Addition Preliminary Plat documents received March 10, 2014: <br />1. Full size Preliminary Plat drawings prepared by Plowe Engineering dated March 10, 2014. <br />Sheets CO through C4-2, Landscape plan, Preliminary Plat, Resource Inventory, Build Out <br />Phasing plan, and Certificate of Survey. <br />2. Storm water calculations prepared by Plowe Engineering. <br />3. Stormwater Drainage Report with HydroCAD output dated 03/10/14 by Plowe Engineering <br />4. Drainage areas plans dated 03/11/14 by Plowe Engineering <br />General Comments: <br />I. The applicant is to submit RCWD permit correspondence and the approved wetland <br />delineation report prior to final plat approval. <br />2. Obtain permits for the project: RCWD, NPDES, MCES, MPCA, MDH, and Anoka County. <br />3. Operation and Maintenance Agreement for stormwater management facilities will be <br />required. <br />4. Easements must be provided covering proposed on -site stormwater management facilities <br />and should cover a horizontal area at least ten feet beyond the 100-year high water elevation. <br />Street and Trail Comments: <br />Staff will review and determine the best location for the trail extending north -south <br />throughout the development. <br />2. Staff will review and determine the best location for the trail and/or sidewalk along Robinson <br />Drive. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.