My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/09/2005 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2005
>
02/09/2005 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 4:20:44 PM
Creation date
4/7/2014 4:20:37 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
02/09/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pl anni ng & Zo ni n g B o ar d <br />Feb r ua ry 9 , 20 05 <br />Page 5 <br />APPROVED MINUTES <br />Randy Molin, Facilities Manager, stated with respect to landscaping when staff came out <br />in 2003 they were doing some reconstructive planting. He noted they have had success <br />with the plantings on the berm. He indicate d they had taken care of the trees on the lot <br />line, but a number of them had died of natu ral causes. He stated the other trees were <br />looking good and he believed they had done a good job of taking care of the landscaping. <br />He noted the two trees on the berm were 6 f oot tall maple trees. He stated there were <br />bushes on the berm also. <br /> <br />Chair Rafferty stated he had the opportunity to have a tour of the Molin plant and was <br />impressed with the facilities and appreciated the tour. <br /> <br />Mr. Tralle asked if any of the noise levels would be going up. Mr. Molin replied the <br />outdoor cranes have had favorable comments from the neighbors. He indicated the <br />cranes were electric and very quiet. He stated the reason they were adding the third bay <br />was because at busy times during the year th ey needed to store inventory for upcoming <br />jobs, so they needed to have room for that material. He stated th ey were not increasing <br />production. <br /> <br />Mr. Hyden made a MOTION to close the pub lic hearing at 7:18 p.m. and was supported <br />by Mr. Tralle. Motion carried 5-0. <br /> <br />Mr. Hyden made a MOTION to recomme nd approval for a Conditional Use Permit <br />Amendment, and Site Plan Review, to allo w for additions to ex isting building, Molin <br />Concrete, 415 Lilac Street and was su pported by Mr. Laden. Motion carried 5-0. <br /> <br />E. PUBLIC HEARING for Circle Pines Regi stered Land Survey for Lots 11 <br />and 12, Block 8, and Lots 9-14, Block 10, Lexington Park Lakeview <br /> <br />Chair Rafferty opened the pub lic hearing at 7:21 p.m. <br /> <br />Staff stated the City of Circle Pines wished to acquire a small area of land on the south <br />side of North Road. This area is covered by co unty road easement for Lake Drive. Over <br />time, the easements in this area became co mplex. Circle Pines wants to clear up the <br />easement definitions to facilitate their prope rty acquisition efforts. A registered land <br />survey (RLS) is a common means of accomplishing this. The RLS is similar to a plat and <br />must be processed like a plat. The entire ar ea proposed for the RLS is within Lino Lakes, <br />so Lino Lakes must review it. <br /> <br />Staff presented their analysis and indicated th ere were still outstanding issues that called <br />for additional information. Staff recommended opening the public hearing, taking <br />comments, and continuing the public hearing to the March 9 P&Z meeting. <br /> <br />Mr. Hyden asked if they needed to find out w ho the owners are of the tracks. Mr. Smyser <br />replied that was correct that needed to be clarified. <br /> <br />Mr. Hyden asked if all of the owners had to be contacted to be ma de aware of what was <br />going to take place. Mr. Smyser replied that was correct. <br />
The URL can be used to link to this page
Your browser does not support the video tag.