Laserfiche WebLink
Development Contract — Site Grading Only <br />Pine Glen <br />March 13, 2006 <br />i) The street right -of -way, storm water storage ponds, and surface <br />water drainage ways shall be graded prior to commencement of <br />utility construction. <br />J) <br />Drainage swales, ditches, storm water storage ponds and other high <br />risk erosion areas shall be protected from erosion. <br />k) All remaining grading must be completed prior to issuance of <br />building permits. <br />1) Protect streets from erosion deposits. This should include a <br />combination of roadside silt fences, roadside sod strips, catch basin <br />rock bale inlet protection, rock construction entrances, straw mulch, <br />and/or street sweeping. <br />in) The developer's engineer shall certify, in writing with an as -built <br />survey, that all grading complies with the grading plan prior to <br />issuance of building permits. <br />n) A legal covenant shall be included within the homeowner's <br />association documents prohibiting the use of phosphorus on lawns. <br />o) The developer shall be responsible for ascertaining that site <br />geotechnical and groundwater conditions are adequate and <br />conforming with the grading and site improvements as proposed. <br />5. The Developer shall place iron monuments at all lot and block corners and at <br />all other angle points on boundary lines. Iron monuments shall be placed <br />after all street and lawn grading has been completed in order to preserve the <br />lot markers for future property owners. Lot corner irons on the back <br />property line shall be installed so that the top of the iron corresponds to the <br />finished ground elevation in accordance with the approved grading plan - <br />g„ard stakes shall be appropriately installed to mark these irons. <br />6. The Developer agrees to maintain, at all times before acceptance of the <br />streets by the City, an access road suitable for use by emergency, police and <br />fire department equipment. The adequacy of such road shall be the sole <br />determination of the City. Furthermore, such access road shall be located no <br />more than 150 feet from any structure built within the Subdivision. <br />7. The Developer shall promptly clear dirt and debris, within public right-of- <br />ways, and drainage and utility easements, resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) days <br />after notification by the City. The Developer or its assigns shall be <br />responsible for all necessary street and storm sewer maintenance including <br />street sweeping, storm sewer cleaning, ditch cleaning and pond dredging, <br />page 5 <br />-67- <br />