My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/24/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
04/24/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 5:07:36 PM
Creation date
4/17/2014 9:02:40 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/24/2006
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• AGENDA ITEM 6C(ii) <br />• <br />STAFF ORIGINATOR: <br />CITY COUNCIL <br />MEETING DATE: <br />TOPIC: <br />VOTE REQUIRED: <br />Michael Grochala, <br />April 24, 2006 <br />Consideration of Resolution No. 06 -67, Accepting <br />Bids and Awarding Contract, Legacy at Woods Edge <br />— Phase 3, Streetscaping Improvements <br />Simple Majority <br />BACKGROUND: <br />Sealed bids were received and publicly opened at 10:00 a.m. on March 23, 2006. The <br />results of the bid opening are presented below. The bid package included four <br />components. The scope of work identified in the Base Bid is work that is to be <br />substantially completed in 2006. Alternate 1 consists of work that is scheduled to begin <br />in 2007. Alternates 2 and 3 consist of stormwater drainage enhancements that are not <br />necessary to complete the project. <br />City Council action is required to award a construction contract to the lowest <br />responsible bidder. <br />Contractor <br />Base Bid <br />Total Alternate 1 Total <br />(Sched B) Alternate 2 <br />Total <br />Alternate 3 <br />Total Bid <br />1 <br />Jay Bros. Inc. <br />$ 725,352.61 <br />$ 824,379.77 <br />$ 77,642.40 <br />$ 35,352.80 <br />$ 1,662,727.58 <br />2 <br />Pember Companies, Inc. <br />$ 725,707.50 <br />$ 947,558.75 <br />$ 89,960.00 <br />$ 34,314.00 <br />$ 1,797,540.25 <br />3 <br />LS Black Consructors, Inc. <br />$ 796,299.74 <br />$ 1,005,903.50 <br />$ 87,468.80 <br />$ 44,054.10 <br />$ 1,933,726.14 <br />4 <br />Northway Irrigation Inc. (Invalid Bid) <br />$ 102,375.00 <br />$ 106,461.00 <br />$ - <br />$ - <br />$ 208,836.00 <br />Engineer's Estimate <br />$ 747,492.00 $ 940,428.70 $ 69,200.00 $ 16,490.00 $ 1,773,610.70 <br />The low bid received was submitted by Jay Bros. Inc., of Forest Lake, Minnesota in the <br />amount of $1,549,732.38 based on the Base Bid plus Alternate 1. The bid is <br />approximately 9% under the engineers estimate. A copy of the consulting engineer's <br />recommendation and the complete bid tabulation are attached. <br />RECOMMENDATION: <br />Staff recommends adoption of Resolution No. 06 -67 awarding the Base Bid to Jay <br />Bros. Inc., of Forest Lake, Minnesota in the amount of $725,352.61. The resolution <br />also reserves the City's right to award the Alternate 1 bid no later than October 24, <br />2006 per an agreement with Jay Bros., and rejects Bid Alternates 2 and 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.