Laserfiche WebLink
f <br />Lino Lakes Storm Water Utility Budget <br />2/15/2006 <br />Sweeping /Cleaning /Repairs <br />Equipment (1) <br />Personnel - 1.5 GMW <br />SWM Projects <br />Pipe Inspections /maint <br />;Ditch & Pond Cleaning <br />Street Reconstruction (2) <br />NPDES Requirements <br />2007 2008 2009 <br />85,000 90,000 1 95,000 <br />42,500 44,625 46,856 <br />95,000 , 99,750 r 104,738 <br />50,000 51,500 <br />50,000 51,500 53,045 <br />1-50,000 51,500 5-3-",64. <br />3,045 <br />525,000 540,750 556,973 <br />25,000 i 25,000 , 25,000 <br />2010 2011 <br />100,000 105,000 <br />49,199 51,659 <br />109,974 1 115,473 <br />53,045 F 54,636 £ 56,2751 <br />Total Budget <br />922,500 <br />954,625 987,701 <br />54,636 56,275 <br />54, 636 56,275 <br />573, 682 ._.. 590,892 1 <br />25,006 I 25,000 <br />1,021,764 <br />,056,851 <br />11) Equipment Needs <br />Sweeper <br />Jeetter/Vac - 1/2 of cost <br />,Single Axle Dump <br />Estimated 10 service life <br />Annualized cost <br />135,000 <br />140,000 <br />150,000 <br />425,000 <br />/10 <br />Average Budget: = <br />42,500 <br />2) A. Storm Sewer portion of Street Reconstruction per PMP <br />The above example assumes 100% funding of the storm water costs of the forecasted street reconstruction by <br />the Storm Water Utility. <br />Feasibility Study A- LINOL0602.00 <br />City of Lino Lakes, Minnesota <br />