Laserfiche WebLink
City of Lino Lakes <br />Estimated Storm Water Utility Budget <br />2/15/2006 <br />F„ ....... #........... y. <br />2007 2008 2009 2010 1 2011 <br />Sweeping/aeaning/Repai s € 85,000 90,000 I 95,000 100,000 105,000 <br />Equipment (1) 42,500: 44,6251 46,856 49,199 51,659 <br />,Personnel - 1.5 GMW 95,000 99,750 104,738 109,974 115,473'. <br />LSWM Projects ; 50,000 - 51,500 53,045 54,636 56,275; <br />!Pipe Inspections/maint ; 50,000 51,500 53,045 54,636 56,275 <br />[-Ditch & Pond Cleaning [ 50,000 I 51,500 53,045 k 54,636 ' 56,275 <br />[-Street Reconstruction 75 %SWU Funded i 393,750.00T 405,562.50 417 72938 430,261.26 443,169.09 <br />NPDES Requirements i 25,000 i 25,000 25,000 ` 25,000 ! 25,000 <br />Total Budget <br />791,250 819,438 848,458 878,344 909,128 <br />}1) Equipment Needs <br />Sweeper 135,000 <br />iJetterNac - 1/2 of cost 140,000 <br />Single Axle Dump 150,000 <br />4.25,000 <br />Estimated 10 service life /10 <br />[-Annualized cost 42,500 <br />'Storm Sewer portion of Street Reconstruction per PMP mm <br />525,0001 540,750 556,973 1 573,682 590,8921 <br />j_v t <br />A <br />849,323 <br />5.0 Alternative Rate Revenue Estimates <br />5.1 Alternative Funding Options <br />The City Council may wish to consider the following funding option were <br />the storm water related costs for the street reconstruction projects are funded <br />by a combination of the Storm Water Utility and the General Fund and /or <br />Assessments. <br />5.2 75 % SWU Funded Scenario: <br />If the storm water related costs of the forecasted average street reconstruction <br />costs were paid 75% by the Storm Water Utility the rate for the SWU would <br />be $3.75 per REU /month. <br />Feasibility Study A- LINOL0602.00 <br />City of Lino Lakes, Minnesota Page 21 <br />