My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/22/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
05/22/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2014 3:35:53 PM
Creation date
4/18/2014 1:56:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/22/2006
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />ESTIMATE NO. 2 (FINAL) <br />2005 OVERLAY PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 13329.001 <br />PERIOD ENDING: December 2, 2005 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />SANITARY SEWER <br />1 MOBILIZATION LS 1.0 1.0 $ 2,000.00 $ 2,000.00 <br />2 ADJUST MANHOLE /CATCH BASIN FOR WEAR COURSE EA 3.0 - $ 150.00 $ - <br />3 ADJUST GATE VALVE FOR WEAR COURSE EA 1.0 - $ 125.00 $ <br />4 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT LF 500.0 - $ 5.00 $ - <br />5 BITUMINOUS CURBING LF 1,200.0 1,200.0 $ 3.00 $ 3,600.00 <br />6 COMMON EXCAVATION CY 400.0 400.0 $ 9.75 $ 3,900.00 <br />7 AGGREGATE BASE CLASS 5 TN 700.0 700.0 $ 14.75 $ 10,325.00 <br />8 FULL DEPTH PATCHING SY 3,500.0 3,500.0 $ 10.50 $ 36,750.00 <br />9 BITUMINOUS MATERIAL FOR TACK COAT GAL 700.0 350.0 $ 1.25 $ 437.50 <br />10 BITUMINOUS WEARING COURSE, 2350 TYPE LV 4 TN 1,180.0 906.03 $ 35.75 $ 32,390.57 <br />SUBTOTAL <br />$ 89,403.07 <br />CHANGE ORDER NO. 1 <br />1 RECLAIM BITUMINOUS SY 11,882.0 12,450.0 $ 0.98 $ 12,201.00 <br />2 GRADE GRAVEL RS 42.0 42.0 $ 200.00 $ 8,400.00 <br />3 BITUMINOUS BASE TN 1,480.0 1,650.86 $ 35.75 $ 59,018.25 <br />4 HAUL EXCESS MATERIALS CY 330.0 840.0 $ 10.00 $ 8,400.00 <br />5 BITUMINOUS CURBING LF (1,200.0) (1,200.0) $ 3.00 $ (3,600.00) <br />6 COMMON EXCAVATION CY (400.0) (400.0) $ 9.75 $ (3,900.00) <br />7 AGGREGATE BASE CLASS 5 TN (700.0) (700.0) $ 14.75 $ (10,325.00) <br />8 FULL DEPTH PATCHING SY (3,500.0) (3,500.0) $ 10.50 $ (36,750.00) <br />SUBTOTAL <br />$ 33,444.25 <br />TOTAL ESTIMATE NO. 2 (FINAL) $ 122,847.32 <br />- 3 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.