Laserfiche WebLink
NOTES: <br />HAND LOOSEN ROOTS OF COVITUNE U7ED MATERIAL <br />SCARIFY BOTTOM &SIDES OF HOLE PRIOR TO PLANTING <br />ODECIDUOUS SHRUB DETAIL <br />1R.. 1.-0. <br />DOUBLE STRAND <br />14 GA. WIRE <br />36'0 120 • <br />INTERVALS <br />TREE WRAP TO <br />FIRST BRANCH <br />8'-0' STEEL <br />STARE <br />STRAP; 16X 1 1/2" WIDE <br />POLYPROPYLENE OR <br />POLYETHYLENE <br />' -- FLAGGING; <br />ONE PER WIRE <br />MULCH; 4' DEEP <br />SHREDDED •, <br />BARK <br />SOD <br />TOP SOIL <br />GRADE <br />ROOTB4L1 TO SIT <br />ON SUBGRADE <br />NOTES: <br />SLi1RBV 80170.. & SIDES OF HOLE PRIOR TO PLANTING. <br />rxrX24' <br />WOOD STAKE SET 0 ANGLE <br />TWO ALTERNATE METHODS OF TREE STARING ARE ILLUSTRATED. <br />?6 THE CONTRACTORS OPTION TO STAKE TREES; HOWEVER <br />THE CONTRACTOR 15 RESPONSIBLE FOR MAINTAINING TREES IN A <br />PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD. <br />ODECIDUOUS TREE DETAIL <br />I/r. 1' -0' <br />DOUBLE STRAND <br />74 C.A. WIRE <br />36 ®120' <br />INTERVALS <br />STRAP; I6X 1 1/2" WIDE <br />POLYPROPYLENE OR <br />POLYETHYLENE <br />FLAGGING,' <br />/ONE PER RIME <br />MULCH; 4'DEEP <br />SHREDDED BARK <br />SOD <br />TOP SOIL <br />SOBGRADE <br />'XrX24' <br />WOOD STAKE <br />SETIP ANGLE <br />NOTES: <br />CONIFER TO HAVE HARDWOOD MULCH UNLESS OTHERWISE NOTED. <br />NO MULCH TO BE IN CONTACT WITH TRUNK <br />R007BAfL 70 SIT <br />ON SUBGRADE <br />PLANTING <br />SOIL <br />SCARIFY BOTTOM & 53005' OF HOLE PRIOR TO PLANTING. <br />TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED. <br />IT IS THE CONTRACTORS OPTION TO STAKE TREES; HOWEVER, <br />THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TREES IN A <br />PLUMB POSITION THROUGHOUT ME GUARANTEE PERIOD. <br />OCONIFEROUS TREE DETAIL <br />NOTES: • <br />CONIFER 70 HAVE HARDWOOD MULCH UNLESS OTHERWISE NOTED. <br />NO MULOI TO BE IN CONTACT WITH TRUNK <br />SCARIFY BOTTOM 6 SIDES OF HOLE PRIOR TO PLANTING <br />LANDSCAPE <br />FABRIC <br />SUBGRADE - <br />RDOTBALL TO -- <br />SIT ON <br />SUBGRADE <br />MULCH; 4'DEEP <br />SHREDDED BARK <br />SOD <br />P.V.C. EDGING <br />PIANTINCSOIL <br />-CEIITER /TUG OFSHRUB <br />IN BED TO TAKE PRECEDENCE <br />OVER DIMENSION FROM EDGE <br />OCONIFEROUS SHRUB DETAIL <br />(/2'. 1,0" <br />QLANITY <br />7BD <br />COMMON NAME <br />LITTLE BWESTIEM <br />PURPLE CONETLOWER <br />STELLA DE 040 <br />GOLOSNRM BLACK-EYED SUSAN <br />BOTANICAL NAME SIZE <br />_--- - <br />SCMAZCHYRIUMSCOPARIUM 6' POT 18' O.0 STAGGER; <br />'j <br />EOUNACEA PURPUREA _ 6 -POT 18'0.5 STAGGER <br />HEMMEROCALLLS STELLA DE ORO• 6 POT 12 0.C. STAGGER. <br />1 88088 714 SOLOSTURM' 6' POT II" D.C. STAGGER' <br />OPERENNIAL BED PLANTING LEGEND <br />0 <br />QUAMTY COMMON NAME <br />6 AUSTRIAN PINE <br />2 BLACK HILLS SPRUCE <br />13 MARSHALS ASH <br />2 REDMOND LINDEN <br />4 NORTHWOOD MAPLE <br />2 RADIANT CRA8APPLE <br />32 MISS KIM LILAC <br />30 GOLDFLAMES %RA <br />17 RED TWIG DOGWOOD <br />B RUCOSA ROSE CAREFREE BEAUTY' <br />TECFNFY COLUMNAR ARBORVITAE <br />DWARF BUSH HONEY SUCKLE <br />BOTANICAL NAME <br />%NUS MGM <br />PICEA QAUCA OENSATA' <br />08AXINU5 PENNSYLVANICA 'MARSHALL' <br />17014 XEUCNLORA REDMOND <br />AIER RUBRUM NORTHWOOD" <br />MALLS RADIANT- <br />.. SYRINGA VELUTINA MISS KIM' <br />38 <br />23 <br />(6 <br />SA8/A JUNIPER .__. _..__. .-.. <br />GROW SUMAC <br />OPLANTING LEGEND <br />5PIREA MAMMA 'GOLDFLAME- <br />CORNUS STOLONIFERA' <br />RUGOSA ROSE CAREFREE BEAUTY' <br />7HUJA OCCIDENTALS TECHNY' <br />_ <br />DIERVILA 10(85884 <br />JUNIPERUS CHINENSIS TABIA' <br />RHOS AROMA7750 'GROLO' <br />512E <br />4,6'19 4 8 <br />4'-6'13 8 B <br />2'8 dB <br />2"I TAB <br />2'888 <br />1'868. _._._._. <br />• 18' -24'14 POT <br />18'-24'N. POT <br />18 -24'14 POT <br />18,24'; Ft, POT__ . -.. . <br />3' H, POT, SPACE 5' O.0 <br />12' -18'H. POT_ <br />(2- -18'H, POT <br />12', POT .. ._._. . <br />BIRCH STREET <br />8ER. <br />-- .- __-__� <br />3,0-HIGH <br />BERM <br />SEED RESTORATION <br />POND <br />PERENNALL <br />3,0' HIGH <br />BERN <br />5••0 -H1 <br />BERM <br />• <br />3 ROWS SOD <br />ALONG CURB <br />L _ z X11 ■■■■ sIC %i PEREwN ED <br />Ifo■.MMINIII trr�■ ■■ ■ ■ ■IM■■■■■■■■NEIMI'iiio ■■ ■■I•• � <br />VIAL BED i 1 i PERENNIAL BED <br />a � iIi <br />I <br />' �� <br />I B„ � ''�L . <br />i "� SEED RESroaanDIV ` <br />I'r <br />7 1 11,5■ @ ■11 ■ ■11■d® ■li■ ®Y■■■ ■ ■ ■ ■ ■P1 ■■■ �_ra <br />. <br />1100 (10000 <br />i <br />it <br />• <br />L► f <br />PRAIRE SEED MIX <br />O1 "..30,_0" <br />LANDSCAPE PLAN <br />PLANTING SPECIFICATIONS <br />I. PLANTING BED PREPARATION ALL MASS PLANTING BEDS SHALL BE ITLLED 70 A MINIMUM DEPTH OF <br />10'. AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION. <br />2. RACK FILL SOIL USE SOL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS REMOVE <br />ALL DEBRIS INCLUDING ROCKS LARGER THAN 3• EXAME7DL <br />3 FERTILIZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH DRIED BONE <br />MEAL OR OTHER SPECIFIED 808730IZER MIXED IN waif THE PLANTING SOIL PER THE MANUFACTURERS <br />' INSTRUCTIONS <br />4. MULCH MA7EBLAL AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL RANTING BEDS TO 3' <br />DEPTH OVER FIRER MAT WEED BARRIER ALL PERENNIAL PLANTING BEDS TO RECEIVER 3' DEEP <br />• SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER ALL EVERGREEN AND DECIDUOUS <br />TREES 70 RECE7VE 6' DEEP SHREDDED HARDWOOD MULCH" VIM NO MULCH IN DIRECT CONTACT WITH <br />• THE TREE TRUNK. <br />S. TREE STAKING IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO STAKE AND/OR GUY THE TREES <br />ACCORDING TO THE DETAILS IT IS THE CONTRACTORS RESPONSIBILITY TV TAKE EVERY STEP <br />• NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB CONDITION AT ALL <br />TIMES UNTIL THE END OF 714E PLANT GUARANTEE PERIOD ESPECIALLY WHERE VANDALSML. SOIL OR <br />WIND CONOIONS AREA PROBLEM. <br />6. TREE WRAPPING WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREP5 PAPER <br />MANUFACTURED FOR THIS PURPOSE. WRAP ALL D80DIIOU5 TREES PLANTED IN THE FALL PRIOR TO 12 -1 <br />AND REMOVE ALL WRAPPING AFTER 5.1. <br />7. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT-SPRUCE UNLESS OTHERWISE SPECIFIED. <br />8. PLANTING PLAN: ALL PROPOSED PLANTS SHALT. BE LOCATED CAREFULLY AS SHOWN ON THE PLANS <br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DSCREPAN0ES M QU4NTT71E5 EXIST. <br />SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. DO NOT SCALE <br />DRAWINGS. <br />9. EDGING: EDGING SHALL BE 4' P.V.C. CAMMEROAL GRADE EDGING WITH AX (BIMETAL ANCHOR STAKES <br />PER 20 FOOT SECTION. ALL MASS PLANTING BEDS SHALL HAVE EDGING PLACED BETWEEN MULCH AREA <br />AND ANY ADJACENT TURF AREA <br />GENERAL NOTES <br />I. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE GENERAL <br />' CONTRACTOR AND BY CALLING GOPHER STATE ONE CALL (454-0002) PRIOR TO STAKING PLANT <br />i LOCATIONS <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PIANTB1GINSTALLATIONS WITH OTHER <br />CONTRACTORS WORKING ON SITE <br />3. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSING ARE FOUND ON ATE, WHETHER SHOWN <br />ON THE ORAWNG OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED <br />AND/OR ARE IN AN AREA TO BE GRADED, ANY QUESTION REGARDING WHETHER PLANT MATERIAL <br />50107)10 REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT <br />PRIOR TO REMOVAL. <br />4. ALL EXISTING TREES 7O REMAW TO BE FERTILIZED AND PRUNED 70 REMOVE DEAN WOOD AND <br />DAMAGED OR RUBBING 8RANCNES. <br />5. B8 TREES AND SHRUBS ARE BALLED AND BURLAPS/. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL 15 REQUESTED OF THE <br />LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR 70 THE SUBMISSION OF A N0 AND/OR <br />• QUOTATION. <br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR <br />NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />8. CONTRACTOR 15 RESPONSIBLE FOR ONGOING MAINTENAN58 OF ALL NEWLY INSTALLED MATERIALS <br />UNTIL TIME OF OWNER ACCEPTANCE ANY ACTS OF VANDALISM OR DAMAGE WHICH MAO OCCUR PRIOR <br />TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION. <br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE LATE OF ACCEPTANCE BY THE <br />LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLACING OF ALL LANDSCAPE MATERIALS. NO <br />PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />• 17. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ON CALENDAR YEAR FROM THE <br />DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO <br />THE OWNER. <br />PLANTING NOTES <br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE <br />IMMEDIATE AREA <br />1. ALL PUNT MATERIAL LOCATIONS MUST BE RENEWED AND APPROVED BY THE LANDSCAPE AROBTECT <br />PRIOR TO ANY AND ALL DIGGING. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIEN0ES IN 704E PLANT SELECTIONS, SOIL <br />CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT MATERIAL <br />ESTABLISHMENT SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEFICIENCIES 70 THE <br />ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAYBE NEEDED IN FIELD. SHOULD AN <br />ADJUSTMENT BE ADVISED, THE LANDSCAPE AROBTECT MUST BE NOTIFIED. <br />5. 41.0 PLANTS TO BE INSTALLED AS PER PUNTING 0ETAILS. <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY IDENTIFIED <br />(COMMON OR LATIN NOMENOATURE) WI7H A PLASTIC TAG WHICH SHALL NOT BE REMOVED PRIOR 70 <br />OWNER ACCEPTANCE <br />7. WHERE SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HEW 7' BELOW <br />SURFACE ELEVATION OF TRIAL, SLAB, CURB, ETC <br />8. SOD SHALL RE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES <br />STEEPER THAN 311 OR IN DRAINAGE SHALES, THE SODSNALL BE STAKED TO THE GROUND. <br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO RECEIVE SOD. <br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. <br />IRRIGATION NOTES <br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SHOP DRAWING ILWS7RATING AN <br />IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK WHEN BIDDING THESE SHALL <br />BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO ORDER. <br />2. VERIFY EKISTINC/PROPOSED IRRIGATION SYSTEM LOCATION. <br />3. UNLESS OTHERWISE NOTED ALL SOD/SEED AND PLANTING AREAS INDICATED ON PLAN SHALL BE 100 8 <br />IRRIGATED THE IRRIG4TION SHALL INCLUDE THE PUBUC RIGHT OF WAY BETWEEN PROPERTY LINE AND <br />BACK OF CURB OR SOUND WALL WHERE NEW LANDSCAPE IMPROVEMENTS ARE PROPOSED <br />4. I7 SHALL BE THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL SODDED/SEEDED <br />AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND <br />ABUTTING BUILDING FOUNDATION. <br />S. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING/LAWN IRRIGATION <br />SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH <br />REQUIREMENTS. <br />1 <br />A PETER HILLER 015662 <br />l herebranyr Met Mb Maa am I AmdF.4044 <br />was 0resowl yaoe oraa4n..rMraMtM4 <br />end than I am a 4aN PPbtad a.WMa aaen <br />Me Ism el the Stine ofMhwaa ea 6570d by <br />',heed and rte. <br />Project Information <br />MILLERS CROSSROADS SHOPPING CENTER <br />BID DOCUMENTS ISSUED 516-06 <br />Drawing History / Revisions <br />CITY SUBMITTAL 12.72415 <br />REVISED CITY SuBMLTTAL 2 -77-08 <br />REVISED CITY SUBMITTAL 3-28-06 <br />REVISED L7TY SUBMITTAL 7-27-08 <br />REVISED CITY SUBMITTAL 841-08 <br />RECEIVED <br />AUG 0 3 2006 <br />CITY OF LINO LAKES <br />30 <br />60 <br />100 <br />Supervising O(/ice <br />SG Paul, MN <br />7S2 Stillwater Road <br />Mall0medi, MN 55115 <br />P: 651.631.1300 F. 651.6311500 <br />Protect Architect <br />A. PETER HILLER <br />Proker R pawn BY Checked 89 <br />RAO54110 SEB /AA SGC <br />Sheet Number <br />Ll <br />