My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/28/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
08/28/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2014 1:32:58 PM
Creation date
4/24/2014 12:49:37 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/28/2006
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: <br />Copies To: <br />From: <br />Date: <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />James E. Studenski, P.E. Reference: The Preserve Development <br />City Engineer Site Review <br />Thomas D. Prew, P.E. <br />August 22, 2006 <br />Proj. No.: <br />Routing: <br />City of Lino Lakes, Minnesota <br />13604.009 <br />The following site review is based on these submittals: <br />1. Plat sheets dated August 13, 2006 and July 27, 2006. <br />2. Plan sheets C.4.03 dated July 28, 2006, C.8.01 dated July 6, 2006, and C.8.02 dated July 13, 2006. <br />Plat Comments: <br />1. All items have been addressed. <br />Retaining Wall Cross- Section Comments: <br />1. Engineering calculations and fencing must be provided for all retaining walls greater than 4' in height. <br />2. City of Lino Lakes Public Works has requested that a W -Beam Guardrail (Mn/DOT Standard Plate <br />8307) be installed in retaining wall areas adjacent to the roadway. <br />3. Guard rail must be a minimum of 5 feet from back of curb. <br />4. Guard rail must be extended 25 feet beyond end of all retaining walls. <br />5. Provide stationing for all retaining wall and guard rail termini and offsets from centerline. <br />6. A typical section must be provided for the retaining wall area. <br />7. Retaining wall to meet Mn/DOT Standard Plan. <br />Additional Comments: <br />1. All items per TKDA review dated July 27, 2006 must be addressed. <br />2. Standard Details are acceptable and must be included within Final Plan Set. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.