COMPENSATING CHANGE ORDER NO. 1
<br />PERIOD ENDING: July 27, 2006
<br />BIRCH STREET TRAIL IMPROVEMENTS
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA PROJECT NO. 13276.002
<br />Ilk MN /DOT CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT
<br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT
<br />BIRCH STREET TRAIL IMPROVEMENTS
<br />1 2021.501 MOBILIZATION LS 1.0 1.00 $ 6,000.00 $ 6,000.00 $ - $ 6,000.00
<br />2 2101.502 CLEARING TR 25.0 30.0 $ 75.00 $ 2,250.00 $ 375.00 $ 1,875.00
<br />3 2101.507 GRUBBING TR 25.0 30.0 $ 75.00 $ 2,250.00 $ 375.00 $ 1,875.00
<br />4 2104.505 REMOVE (MILL) BITUMINOUS SURFACING LF 90.0 192.0 $ 10.00 $ 1,920.00 $ 1,020.00 $ 900.00
<br />5 2105.501 COMMON EXCAVATION (P) CY 1,700.0 1,700.0 $ 10.00 $ 17,000.00 $ - $ 17,000.00
<br />6 2105.501 DITCH /DETENTION BASIN EXCAVATION (P) CY 400.0 - $ 9.00 $ - $ (3,600.00) $ 3,600.00
<br />7 2105.507 SUBGRADE EXCAVATION CY 300.0 - $ 7.00 $ - $ (2,100.00) $ 2,100.00
<br />8 2105.522 SELECT GRANULAR BORROW (CV) CY 300.0 2,277.0 $ 12.0D $ 27,324.00 $ 23,724.00 $ 3,600.00
<br />9 2105.525 TOPSOIL BORROW (LV) CY 300.0 385.0 $ 10.00 $ 3,850.00 5 850.00 $ 3,000.00
<br />10 2211.501 AGGREGATE BASE, CLASS 5 FOR TRAIL (100% CRUSHED) TN 3,210.0 1,846.0 $ 13.00 $ 23,998.00 $ (17,732.00) $ 41,730.00
<br />11 2350.501 TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIL (C) TN 665.0 743.4 $ 50.00 $ 37,167.50 $ 3,917.50 $ 33,250.00
<br />12 2411.618 MODULAR BLOCK RETAINING WALL SF 800.0 783.0 $ 19.00 $ 14,877.00 $ (323.00) $ 15,200.00
<br />13 2501.515 15" RC PIPE APRON W/ TRASH GUARD EA 7.0 7.0 $ 1,200.00 $ 8,400.00 $ - $ 8,400.00
<br />14 2501.515 24" CS METAL APRON W/ TRASH GUARD EA 2.0 2.0 $ 600.00 $ 1,200.00 $ - 5 1,200.00
<br />15 2503.541 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 100.0 99.0 $ 32.00 $ 3,168.00 $ (32.00) $ 3,200.00
<br />16 2503.541 EXTEND 24" STORM SEWER PIPE LF 12.0 4.0 $ 50.00 5 200.00 5 (400.00) $ 600.00
<br />17 2506.502 CONSTRUCT 48" DIAMETER MANHOLE, TYPE 406 EA 1.0 1.0 $ 2,000.00 $ 2,000.00 $ - $ 2,000.00
<br />18 2506.522 ADJUST FRAME AND RING CASTING (CB OR MH) EA 1.0 1.0 5 250.00 $ 250.00 $ - $ 250.00
<br />19 2506.522 ADJUST GATE VALVE CASTING EA 2.0 1.0 $ 100.00 $ 100.00 $ (100.00) $ 200.00
<br />20 2511.501 RANDOM RIP RAP CLASS III CY 20.0 14.0 $ 70.00 $ 980.00 $ (420.00) $ 1,400.00
<br />21 2521.501 4" CONCRETE WALK (PED RAMPS) SF 650.0 526.0 $ 4.00 $ 2,104.00 $ (496.00) $ 2,600.00
<br />22 2531.501 CONCRETE CURB AND GUTTER LF 100.0 - $ 17.50 $ - $ (1,750.00) $ 1,750.00
<br />23 2531.618 TRUNCATED DOME SF 136.0 96.0 $ 20.00 $ 1,920.00 $ (800.00) $ 2,720.00
<br />24 2557.603 FURNISH AND INSTALL 6' HIGH CHAIN LINK FENCE LF 100.0 42.0 $ 20.00 $ 840.00 $ (1,160.00) $ 2,000.00
<br />25 2563.601 TRAFFIC CONTROL LS 1.0 1.00 $ 2,000.00 $ 2,000.00 $ - $ 2,000.00
<br />26 2564.618 ZEBRA CROSSWALK WHITE, POLY PREFORMED SF 450.0 - $ 9.00 $ - $ (4,050.00) $ 4,050.00
<br />27 2573.502 SILT FENCE, TYPE PREASSEMBLED LF 5,400.0 5,200.0 $ 1.60 $ 8,320.00 $ (320.00) $ 8,640.00
<br />28 2573.602 STORM SEWER INLET PROTECTION EA 6.0 6.0 $ 140.00 $ 840.00 $ - $ 840.00
<br />29 2573.602 HAY BALE DITCH CHECK LF 500.0 - $ 2.00 $ - $ (1,000.00) $ 1,000.00
<br />30 2575.505 SODDING TYPE SALT RESISTANT SY 5,700.0 6,739.0 $ 2.10 $ 14,151.90 $ 2,181.90 $ 11,970.00
<br />31 2575.604 EROSION CONTROL BLANKET, CATEGORY 1 (WOOD FIBER
<br />BLANKET) ACRE 1.0 0.75 $ 5,000.00 $ 3,750.00 $ (1,250.00) $ 5,000.00
<br />02 2575.605 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH &
<br />DISC ANCHORING) ACRE 1.0 0.75 $ 1,700.00 $ 1,275.00 5 (425.00) $ 1,700.00
<br />COMPENSATING CHANGE ORDER NO. 1 $ 188,135.40 $ (3,514.60) $ 191,650.0(
<br />
|