My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/02/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
10/02/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 12:45:19 PM
Creation date
4/28/2014 2:38:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/02/2006
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Assessment Worksheet <br />Nature's Refuge Conservation Development <br />Lino Lakes, Anoka County, Minnesota <br />Draft Document — September 25, 2006 <br />Page 13 <br />4_ Water - related land use management district. Does any part of the project involve a shorelan d zoning <br />district, a delineated 100 -year flood plaint or a state or federally designated wild or scenic river land use <br />district? X Yes No <br />If yes, identify the district and discuss project compatibility with district land use restrictions. <br />A portion of the property includes an area with a surface flood hazard area (SFHA) identified as an approximate <br />study area (Unnumbered A Zone) that does not have a previously determined base flood elevation (BFE). The Rice <br />Creek Watershed District has done a study of the regional drainage system, but the basin within the property was not <br />included in that study. The City has not performed a detailed hydrologic study of the basin. <br />The property is not part of a wild or scenic land use district and not within a shoreland overlay district. <br />According to the FEMA Flood Insurance Rate Map, a portion of the site surrounding the main drainage ditch and <br />Wetland 7 is within the 100 -year flood plain surrounding the main east -west drainage ditch. The project is designed <br />to minimize impacts within the floodplain. The only proposed construction within the floodplain are: 1) one street <br />and two pedestrian trails will cross the floodplain and ditch, and 2) the rear portions of 8 lots will lie within the <br />floodplain boundary. <br />The project will necessitate changes to the flood plain boundary. Flood elevation will be established based on the <br />final grading plan for the project. Any floodplain fill proposed will be compensated for. Building and temporary <br />equipment - storage elevations will be determined based on the new floodplain contour. It is probable that the FEMA <br />map will need to revised (Letter of Map Revision or LOMR) or amended (Letter of Map Amendment or LOMA). <br />15. Water surface use. Will the project change the number or type of watercraft on any water br <br />If yes, indicate the current and projected watercraft usage and discuss any potential overcrow <br />with other uses. <br />There are no navigable water bodies on the project site, and none will be created by the project. <br />16. Erosion and sedimentation. Give the acreage to be graded or excavated and the cubic yards of soil to be <br />moved. Describe any steep slopes or highly erodible soils and identify them on the site map. Describe any <br />erosion and sedimentation control measures to be used during and after project construction. <br />The estimated area to be graded is approximately 100 acres. Because of the high water table in the upland portions <br />of the site, grade in the build area will be raised 4 to 6 feet to ensure that building elevations are high enough to <br />avoid water - table- related problems. Thus, an estimated 392,000 cubic yards of imported fill material and an <br />estimated 97,000 cubic yards of on -site excavation and fill will be needed. The majority of the material will not be <br />excavated on -site because most non -build portions of the site will be designated as conservation areas and placed <br />under a conservation easement. Excavation of such areas would be counterproductive in view of the long -term <br />restoration goals for the site. Thus, most fill material will be trucked in from off -site sources. <br />There are no existing steep slopes or highly erodible soils on the site. With the exception of street embankments at <br />the proposed wetland impacts and storm water pond banks, no steep slopes will be constructed on the site. <br />Erosion and sedimentation control measures will follow the Storm Water Pollution Prevention Plan (SWPPP) to be <br />developed for the site. The SWPPP will include the incorporation of Best Management Practices (BMPs) as <br />prescribed by the MPCA and required by the City of Lino Lakes and Rice Creek Watershed District. The granular <br />nature of the soils in the Anoka County area has created issues with wind erosion from construction sites. These <br />problems generally occur when there is a combination of unfavorable conditions that include large areas of exposed <br />soil, hot, dry, windy weather, and improper construction practices such as insufficient silt fence, insufficient dust <br />
The URL can be used to link to this page
Your browser does not support the video tag.