My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/04/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
12/04/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2014 1:31:52 PM
Creation date
5/1/2014 9:42:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/04/2006
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />CSAH 14 (Main Street) from I35E to I35W <br />The project consists of the reconstruction of Main Street (Anoka County State Aid <br />Highway 14) from I -35E to I -35W. Anoka County is the lead agency on the proj <br />The City's share of the project is $ 381,200. Improvements include wide e road, <br />signalization of the 20m Avenue/Main Street intersection and sanitary .fi d water <br />extensions and construction of a pedestrian trail. Funding sources , City' s <br />Municipal State Aid Street fund and the Trunk Utility Fund. <br />Woodridge Estates Trunk Watermain Extension <br />This project includes the extension of Trunk Waterma <br />Lane along County Road J. Current water supply to <br />does not adequately provide water pressure and v. n tEg <br />was provided by interconnect with the City of Shored <br />terminated this service to meet their own water supply r <br />Ware Road to Woodridge <br />oodridge Estates development <br />Until 200 ' lemental water <br />owe oreview has since <br />The estimated project cost is $204,00 <br />Utility Funds. Extension of the wat <br />component of the 49/J Maste <br />development/redevelopment efforts in <br />The project is prop <br />anitary sewer <br />is wor <br />e exte <br />be funded by Trunk <br />this area is a core <br />with potential <br />n. <br />Lift Station No. 6 Upgrade <br />Lift Station No. <br />small area east <br />control equi <br />the Mar <br />s project <br />ownhome development and services a <br />ves upgrading /replacement of electrical <br />The estim <br />Sewer Enterp <br />econs n Feasibility Study <br />The City's <br />Shadow Lake <br />project was last <br />the project failed <br />xisting feasibili <br />ent i <br />ct is proposed to be funded by Sanitary <br />ent Program has identified the reconstruction of West <br />as a p project for several years. A feasibility study for the <br />ared in 2005. However, the Charter required voter referendum for <br />oth 2003 and 2005. The proposed study is intended to update the <br />dy in anticipation of a ballot question in 2007. <br />C <br />ect cost is $10,000. The project is proposed to be funded from the <br />d. <br />
The URL can be used to link to this page
Your browser does not support the video tag.