Laserfiche WebLink
BUILDING - CONSTRUCTION UTILITIES <br />Building Permit Fee Schedule <br />Fee Table <br />Total Valuation <br />Fee <br />$1.00 to $500.00 <br />$23.50 <br />$501.00 to $2,000.00 <br />$23.50 for the first $500.00 plus $3.05 for each <br />additional $100.00, or fraction thereof, to and <br />including $2,000.00 <br />$2,001.00 to $25,000.00 <br />$69.25 for the first $2,000.00 plus $14.00 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $25,000.00 <br />$25,001.00 to $50,000.00 <br />$391.25 for the first $25,000.00 plus $10.10 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $50,000.00 <br />$50,001.00 to $100,000.00 <br />$643.75 for the first $50,000.00 plus $7.00 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $100,000.00 <br />$100,001.00 to $500,000.00 <br />$993.75 for the first $100,000.00 plus $5.60 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$3,233.75 for the first $500,000.00 plus $4.75 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $1,000,000.00 <br />I $1,000,001.00 and up <br />$5,608.75 for the first $1,000,000.00 plus $3.15 for <br />each additional $1,000.00, or fraction thereof <br />Other Inspections and Fees: <br />Work commencing before permit issuance Double Permit Fee <br />2. Erosion Control Inspection Fee (single, two - family, townhomes up to 8 units) $150.00 <br />Multi- family > 8 units, Commercial, Industrial and Institutional determined <br />by separate agreement. <br />3. Erosion Control Reinspection Fee $47.00 per trip <br />4. Inspections outside of normal business hours $47.00 per hour* <br />5. Reinspection fee $47.00 per trip <br />6. Inspections for which no fee is specifically designed $47.00 per trip <br />7. Additional plan review required by changes, additions, or revisions $47.00 per hour ** <br />8. For use of outside consultants for plan checking and inspections, or both Actual Cost * ** <br />9. Deck Permit Fee Permit fee table based <br />10. Basement F ish Pen bit Fee Perm+t fee table based <br />11. In Ground Swimming Pool $141.00 <br />2 <br />