My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/18/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
12/18/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2014 1:54:00 PM
Creation date
5/1/2014 11:47:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/18/2006
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />2009 -2011 <br />Projects identified for the planning period 2009 -2011 include State Aid Street <br />reconstruction, annual Surface Water Management projects, street reconstru �� and <br />utility infrastructure improvements. Projects will be evaluated in more detail 7 and <br />2008. Estimated improvement costs and proposed funding sources are d on the <br />Street and Utility Capital Improvement Program Summary spreads general <br />overview of major projects is included with each year. <br />2009 <br />Overview: Improvements scheduled for 2009 includ <br />and surface water management proj ects as wel <br />improvements. Of significant note is Anoka Co <br />Street interchange programmed for 2009. The <br />approximately $4,500,000 for this project. Additi <br />Project is programmed. This project includes the reco <br />Drive and adjacent streets. The project is dependent on <br />property owners and voter approved r ! um. <br />ec <br />is <br />r' -annual street maintenanc <br />trunk utility and roadway <br />onstructi •. t 0 the 135E/Main <br />antici. « " a cost share of <br />20 meet Reconstruction <br />of West Shadow Lake <br />ty consent of benefited <br />1. 2009 Surface Water Managem <br />2. 2009 Street Sealcoat and Overl <br />3. 2009 Street Reconstruction Proje <br />4. Well No. 6 and P <br />5. Trunk Water, <br />6. 2011 Ste <br />7. CSAH <br />8. CS <br />rod -° <br />oject <br />2010 <br />house <br />vement — ..�xa uck Drive to Aqua Lane <br />AH 14 In <br />5E lnterc <br />Feasibili ` dy <br />ction Reco ction <br />Reconstruct <br />Imu ments sc <br />eme <br />a for 2010 include the annual street maintenance and surface <br />nt . • " s as well as trunk utility and roadway improvements. Of <br />the p reconstruction of Holly Drive from Holly Court to County <br />ct is : « nt on the availability of Municipal State Aid Funds and <br />benefit property owners. Additionally, the program includes the <br />000 gallon ground storage facility two supplement the City's two, 1 <br />d water towers. <br />gnifican "s <br />Road J. Thi <br />special assessor' <br />construction of a <br />million gallon ele <br />2010 S <br />01 <br />e Water Management Project <br />it Sealcoat and Overlay Project <br />rive Reconstruction (Holly Court to County Road J) <br />4. Watermain Improvements (Park Court to Marshan Lane) <br />5. 5 0,000 gallon ground storage /trunk water main <br />
The URL can be used to link to this page
Your browser does not support the video tag.