Laserfiche WebLink
• <br />Main Street Village <br />page 15 <br />In the future, the City should specifically exclude outdoor tables without service from the <br />need for a CUP. This is a clarification that should be made in the ordinance, and we can <br />address that when we do some major ordinance revisions in the near future. <br />ENVIRONMENTAL BOARD ACTION <br />Stormwater management was the focus of the Environmental Board discussion on July 25. <br />This included the importance of the design of the stormwater facilities, such as infiltration and <br />filtration features. In addition, the AUAR requirement for volume control must be addressed <br />in the project design. There also was consideration of revising the landscape plan to <br />substitute some tree species and ensure plantings in infiltration areas are appropriate. <br />The project was reviewed again on November 28. The comments are attached. <br />RECOMMENDATION <br />Re -open public hearing, take comment, continue public hearing to the P & Z Board meeting <br />on February 13, 2008. <br />Staff also recommends that the applicant agrees in writing to a 30 -day extension to the review <br />• period to allow for revisions that will bring the project into compliance with City standards. <br />• <br />This review is based on the following submittals: <br />1. Existing Conditions & Resource Inventory, rec'd October 26, 2007 <br />2. Preliminary Plat, rec'd October 26, 2007 <br />3. Preliminary Site Plan (two sheets), rec'd October 26, 2007 <br />4. Preliminary Utility Plan (two sheets), rec'd October 26, 2007 <br />5. Preliminary Grading & Erosion Control Plan (three sheets), rec'd October 26, 2007 <br />6. Details, rec'd October 26, 2007 <br />7. Preliminary Landscape Plan and Details (two sheets), rec'd October 26, 2007 <br />8. Preliminary Infiltration Details, rec'd October 26, 2007 <br />9. Preliminary Lighting Plan, rec'd October 26, 2007 <br />10. Building Elevations, Sheets Al, A2, A1.0, A1.1, A2.0, A2.1, A5, and two more <br />unnumbered sheets, and color renderings received October 26, 2007 <br />11. Phase 1 Cultural Resources Survey, April 12, 2007, rec'd May 8, 2007 <br />12. Traffic Analysis, May 4, 2007, rec'd July 10, 2007 <br />13. Traffic Circulation and Shared Parking Analysis, received October 26, 2007 <br />14. Wetland Permit Application, June 2006 and June 2007, rec'd July 10, 2007, <br />Notice of Wetland Boundary Modification Request, rec'd July 23, 2007 <br />and revised wetland boundary approval, received October 30, 2007 <br />15. Revised Preliminary Site Plan, Truck Circulation diagrams, and Turning Movements, <br />received via e -mail November 19, 2007. <br />