My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/07/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
01/07/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 12:25:47 PM
Creation date
5/1/2014 1:30:12 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/07/2008
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Village <br />Preliminary Plat Review <br />City of Lino Lakes, Minnesota <br />Page 2 January 2, 2008 <br />7. In conjunction with the City's CUP requirements for a gas station, the following items must be met for <br />the Kwik Trip oil -water separator: <br />a. A minimum of 400 cubic feet of permanent dead pool storage capacity must be provided for <br />each acre of drainage area. <br />b. The minimum pool depth must be 4 feet. <br />c. The minimum oil containment capacity must be 800 gallons. <br />8. The limits of ownership for the sanitary sewer and watermain utilities are being further reviewed by the <br />City of Lino Lakes. <br />9. As requested by the Anoka County Highway Department in a letter dated December 10, 2007, an <br />additional 10 feet of right -of -way will be required along County Road 84 for future construction <br />purposes (60 feet total from centerline). Please provide the additional right -of -way within future <br />submittals. <br />10. At the "future" access road connection to County Road 84, the City of Lino Lakes is requiring <br />additional right -of -way. The additional right -of -way must be configured as a 30 -foot by 30 -foot <br />triangle on the north side of the right -of -way at the connection to County Road 84. The right -of -way <br />triangle is to facilitate the installation of a future traffic signal. <br />11. The Fire Department has reviewed the hydrant locations and they are recommending that the proposed <br />hydrant locations be adjusted. In addition, the Fire Department is recommending that two additional <br />hydrants be installed in the parcel north of the existing bank. A map will be provided to the Applicant <br />for incorporation into the proposed plans. <br />12. The attached drainage comments, dated January 2, 2008 must be addressed. <br />Traffic Analysis Comments: <br />1. An intersection capacity analysis must be performed for the year 2030 at the Slip Ramp/Main Entrance <br />intersection. <br />2. The traffic volume shown entering the site via the slip ramp is the same (189) for Phase 1, Phase 2, and <br />2030 and the traffic volume shown entering the site via the southern entrance is the same (154) for <br />Phase 2 and 2030. Please verify if these volumes are correct and, if they are correct, explain why the <br />volumes for these various periods are the same. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.