Laserfiche WebLink
Cedar Street Reconstruction <br />This project involves the reconstruction of Cedar Street from Otter Lake Road to a point <br />approximately 1,100 feet east. This project was originally contemplated with the <br />development of the Clearwater Creek residential subdivision and the Clearwater Creek <br />Business Park. <br />The estimated project cost is approximately $293,160. The project is proposed to be <br />funded from special assessments previously collected and Surface Water Management <br />funds. <br />Woodridge Estates Trunk Watermain Extension <br />This project includes the extension of Trunk Watermain from Ware Road to Woodridge <br />Lane along County Road J. Current water supply to the Woodridge Estates development <br />does not adequately provide water pressure and volume. Until 2005, supplemental water <br />was provided by interconnect with the City of Shoreview. However, Shoreview has since <br />terminated this service to meet their own water supply requirements. <br />The estimated project cost is $214,200. The project is proposed to be funded by Trunk <br />Utility Funds. <br />Well No. 6 & Pumphouse <br />This project includes the construction of new water production facility. The project is <br />intended to meet growing water demands of the City in accordance with the City's 2003 <br />Comprehensive Water Plan. <br />The estimated project cost is $800,000. The project is proposed to be funded by Trunk <br />Utility Funds. <br />Sanitary Sewer Rehabilitation (Lakes Addition) <br />This project involves the relining of the sanitary sewer system pipes within the Lakes <br />Addition residential area. The project is intended to prevent inflow and infiltration of <br />ground water into the sanitary sewer system. <br />The estimated project cost is approximately $136,500. The project is proposed to be <br />funded from the Sanitary Sewer Enterprise Fund. <br />CI-2 <br />FT <br />• <br />• <br />• <br />