My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/11/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
02/11/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 12:10:20 PM
Creation date
5/5/2014 11:48:27 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/11/2008
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 08 -17 <br />page 3 <br />The City may deny building permits or otherwise prevent an individual use of the sites if <br />this condition would be violated. <br />2. Any restaurant use that includes outdoor seating with service by wait staff will require a <br />conditional use permit and must meet conditions listed in the Zoning Ordinance <br />3. The permit from the Rice Creek Watershed District must be obtained and a copy <br />submitted to the City prior to site work commencing. <br />4. City Engineer review comments must be addressed to his satisfaction. <br />5. Irrigation shall be required in all areas to be sodded and the irrigation shall be shown on <br />the landscaping plan or listed in details. <br />vt <br />6. Developer shall supply information stating how truck circulation dresse on the C� <br />McDonald's site, so that customer parking will not prevent truck circulation during -9'"i <br />business hours. This shall be submitted prior to approval of a final plat or a development <br />agreement. <br />7. An easement for access to the City water tower is required and an executed easement shall <br />be submitted to the City prior to final plat approval. <br />8. The following staging of construction of internal and external road improvements shall be <br />required and shall be addressed in the development agreement: <br />a) with phase one (as shown in this application), the developer shall construct a right <br />tum lane (southbound Otter Lake Road turning right into the project site) at the <br />northern access (existing bank access road), in accordance with Anoka County <br />standards <br />b) with phase one, the developer shall stripe a left turn lane and through lane on <br />northbound Otter Lake Road at the northern access, in accordance with Anoka <br />County standards; a concept striping plan shall be submitted to the City and County <br />for review <br />c) the northern access shall be converted to right in/right out with any additional <br />development that is not included in phase one <br />d) the southern access road shall be constructed with any additional development that is <br />not included in phase one <br />e) to address the City requirement that traffic generated by a proposed subdivision will <br />not degrade the level of service more than one grade: with any additional <br />development that is not included in phase one, the developer shall make needed <br />improvements to Otter Lake Road south of Main Street, including the southern <br />access intersection, including at a minimum through lanes, turn lanes, and medians <br />in accordance with Anoka County requirements; this may or may not include <br />signalization of the southern access intersection, depending on signal warrants, as <br />determined by Anoka County and the City <br />f) with any additional development that is not included in phase one, the developer <br />shall make needed improvements to old Otter Lake Road service road access (west <br />entrance to site) to serve the project, in accordance with City standards <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.