My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/28/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
04/28/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 10:36:50 AM
Creation date
5/7/2014 12:57:53 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/28/2008
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Vaughan' s First Addition <br />Development Contract <br />April 28, 2008 <br />11. Street - Storm Sewer - Pond Maintenance <br />12. Sealcoating Fund <br />13. Aerial Photo Recovery Cost <br />B. If the above escrow amounts are insufficient, the Developer shall make such <br />additional deposits as required by the City. The City shall have a right to reimburse <br />itself from the Escrow upon notice to the Developer, with suitable documentation <br />supporting charge. <br />VI. BUILDING PERMITS <br />A. The Developer agrees that building permits may be issued upon approval of the <br />Final Plat by the City Council at which time all required Financial Security shall be <br />in place with the City. <br />B. Each lot must comply with erosion control measures to prevent any material from <br />leaving the lot. The City of Lino Lakes will not perform any requested inspections <br />on the lot until it complies with the erosion control requirements. <br />C. Each lot must have a City approved Certificate of Grading showing the as -built <br />survey prior to an issuance of a Certificate of Occupancy. It shall be the <br />responsibility of the Developer, its purchasers, builders or contractors to ensure <br />compliance with the grading plan. <br />VII. HOURS OF CONSTRUCTION ACTIVITY <br />A. All construction activity shall be limited to the hours as follows: <br />Monday through Friday 7:00 a.m. to 7:00 p.m. <br />Saturday 9:00 a.m. to 5:00 p.m. <br />Sunday and Holidays No working hours allowed <br />VIII. OWNERSHIP OF IMPROVEMENTS <br />A. Upon completion of the work and construction required by thi s contract and <br />acceptance by the City, the improvements lying within the public easements shall <br />become City property without further notice or action. <br />IX. INSURANCE <br />A. Developer or all its subcontractors shall take out and maintain until one (1) year <br />after the City has accepted the Developer Improvements, public liability and <br />property damage insurance covering personal injury, including death, and claims for <br />page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.