My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/05/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
05/05/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 10:44:50 AM
Creation date
5/8/2014 9:49:45 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/05/2008
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subd 3 <br />• 1 1 • 1 1 I d A ... .. . . ... •. . . . ■.. <br />1'1 . - 11111' ... . . . 1 . .. <br />.'■.. . -- 1.. . 11 <br />as -. 1.1 - as 1 - ... • <br />-s -11-1 - .r. . 14 ..- . - ... - .1 .15 1A .. . : - ... - .1 ... <br />.- - ■I. .-. . 1' <br />Sec. 1.06. Permit Fees. (Note: Sample fee schedules included in the appendix) The city shall <br />establish an Excavation permit fee in an amount sufficient to recover the following costs: <br />(a) the city management costs; <br />(b) degradation costs, if applicable. <br />Subd. 2. Obstruction Permit Fee. The city shall establish the obstruction permit Fee and shall be in an <br />amount sufficient to recover the city management costs. <br />Subd. 3. Payment of Permit Fees. No excavation permit or obstruction permit shall be issued without <br />payment of excavation or obstruction permit Fees. The city may allow applicant to pay such fees within <br />thirty (30) days of billing. <br />Subd. 4. Non refundable. Permit fees that were paid for a permit that the director has revoked for a <br />breach as stated in Section 1.21 are not refundable. <br />Subd. 5. Application to franchises. Unless otherwise agreed to in a franchise, management costs may <br />be charged separately from and in addition to the franchise fees imposed on a right -of -way user in the <br />franchise. <br />Subd. 6. All permit fees shall be established consistent with the provisions of Minnesota Rule 7819.100. <br />Sec. 1.07. Right -of -Way Patching and Restoration. <br />Subd. 1. Timing. The work to be done under the excavation permit, and the patching and restoration of <br />the right -of -way as required herein, must be completed within the dates specified in the permit, increased <br />by as many days as work could not be done because of circumstances beyond the control of the permittee <br />or when work was prohibited as unseasonable or unreasonable under Section 1.15. <br />Subd. 2. Patch and Restoration. Permittee shall patch its own work. The city may choose either to <br />have the permittee restore the right -of -way or to restore the right -of -way itself. <br />(a) City Restoration. If the city restores the right -of -way, permittee shall pay the costs thereof <br />within thirty (30) days of billing. If following such restoration, the pavement settles due to <br />permittee's improper backfilling, the permittee shall pay to the city, within thirty (30) days of <br />billing, all costs associated with having to correct the defective work. <br />(b) Permittee Restoration. If the permittee restores the right -of -way itself, it shall at the time of <br />application for an excavation permit post a construction performance bond in accordance with the <br />provisions of Minnesota Rules 7819.3000. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.