My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/02/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
09/02/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2014 3:56:34 PM
Creation date
5/13/2014 1:13:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/02/2008
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Scenario 1 - Full Build Out (FBO) <br />This scenario models the following effects on resources: <br />• The city's preliminary full build out land use plan prepared as part of this <br />Comprehensive Plan update, <br />• The impervious surface percentages allowed in the city's adopted zoning ordinance, <br />• Protection of high priority wetlands identified through the existing conditions <br />assessment in the RMP, and <br />• 2007 RCWD rules. <br />The results of modeling the FBO scenario indicate the location of sensitive water level points, or <br />flood prone areas, throughout the city (see Appendix A, RMP, Figure 20 - Land Use Alternatives <br />Analysis: FBO withoutRMP conditions). These points include locations of predicted road overtops, <br />less than 1" freeboard on a road, and pond overtops under a 100 -year flood event. <br />During the process of developing the RMP, results of the existing conditions assessment and <br />modeling the first scenario identified potential environmental impacts. Through an iterative <br />process, this information guided the creation of the RMP goals and strategies, the Wetland <br />Preservation Corridor, the city's land use plan presented in Chapter 3, and proposed revisions to <br />impervious surface allowances in the city's zoning ordinance. <br />Scenario 2 — Resource Management Plan -Based Full Build Out (RMP -FBO) <br />This scenario was formed through an iterative process between the city and the RCWD that took <br />into account the following effects on resources: <br />• The revised proposed full build out land use plan presented in Chapter 3 — Land Use <br />Plan <br />• Proposed revisions to allowed impervious surface coverage in the city's adopted <br />zoning ordinance <br />• The Wetland Preservation Corridor prepared in the RMP <br />• Proposed updates to the city's Parks, Natural Open Space /Greenways & Trail System <br />Plan presented later in this Resource Management System Chapter of the <br />Comprehensive Plan <br />• 2008 Watershed District Rules <br />This scenario results in eliminating several of the sensitive water level points, or floodprone <br />areas, that resulted from the FBO scenario (see Appendix A, RMP, Figure 21 - Land Use <br />Alternatives Analysis: FBO with RMP conditions). The final RMP -FBO scenario provides for land <br />use conditions needed to maintain and protect priority resources in the city. These conditions <br />are thread throughout this Comprehensive Plan, most notably in this Resource Management <br />System Plan and in the Land Use Plan, which represent the fundamental framework for future <br />decisions regarding growth and development. <br />• Wet /and Preservation Corridor (WPC) <br />The first outcome of high priority wetland designation was to create the WPC (Figure 2- <br />8). The buffer width standard for high functioning wetlands according to the Wetland <br />Conservation Act (WCA) is 300 feet to maintain habitat and 50 feet to maintain water <br />quality (MNRAM buffer width metric). A customized variable width buffer area is <br />incorporated into the WPC, giving each wetland complex individual attention, rather than <br />using a one size fits all approach. The combination of high priority wetlands and variable <br />width buffer area with the City's defined low development suitability areas produces <br />nodes, and the 100 -year floodplain area produces the diffuse corridor linkage areas. The <br />diffuse corridor linkage areas tie together corridor nodes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.