My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/10/2008 Council Packet (2)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
11/10/2008 Council Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 3:28:31 PM
Creation date
5/16/2014 10:43:11 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/10/2008
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. Contractor License .$50.00 <br />26. SAC (Sewer Availability Charge) per Met Council <br />•27. 3/" Water Meter $165.00 <br />28. 1" Water Meter $325.00 <br />29. MXU Unit $125.00 <br />30. Septic Installation or Repair Permit $150.00 <br />31. Septic Pumping Permit $5.00 <br />32. Demolition Permit $50.00 <br />33. Lawn Sprinkler /Irrigation System Permit (effective June 26, 2008) $50.00 <br />34. Irrigating or Watering of New Landscaping Permit (sod or seed) (effective June 26, 2008) .no charge <br />35. Lawn Sprinkling Violation $25.00 for first violation; <br />$50.00 for each subsequent citation <br />36. Driveway Replacement Permit $50.00 <br />l <br />i <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan <br />review fees and state surcharge fees are non - refundable. <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made out side of normal business hours is a three -hour minimum charge <br />** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />* ** Actual costs include administrative and overhead costs. <br />Sign Permit - Temporary (portable/banner) $25.00 /Term <br />Sandwich Board .$25.00 <br />Touch Pad ..$20.00 <br />Curb Stop Covers $68.00 <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />ESCROW DEPOSITS <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be <br />completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of <br />Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any <br />unfinished work must be completed within six months (weather permitting) from the date of issuance. The <br />following escrow amounts are hereby established: <br />a. Driveway - $1,000.00 <br />b. Exterior Concrete - $1,000.00 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.